BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 8, 2024 at 8:00 PM

Updated February 20, 2025

Site work for a water / sewer project in Beaumont, Texas. Completed plans call for site work for a water / sewer project.

Question Deadline 07/04/2024 Questions received less than seven days prior to the date for opening of Bids may not be answered. The Work generally consists of removal of an existing asbestos-containing wrap from exposed water transmission pipelines, dewatering sections of the pipelines (three pipelines, removed from service for the work one at a time), internal pipeline lining removal and lining replacement, application of a new external pipeline wrap, and construction of a new sacrificial anode cathodic protection system for the pipelines. The Issuing Office for the Bidding Documents is: Lower Neches Valley Authority, 7850 Eastex Freeway, Beaumont, Tx 77708. Interested parties may contact Yassin Gallardo, EIT by phone at (409) 673-0183, or by email at Yassin.gallardo@LNVA.dst.tx.us.

Under Construction

Water / Sewer

$5,000,000.00

Public - State/Provincial

Site Work

21

19

11

9

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
106
Bidding Soon
1,815
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2024

September 16, 2024

Project location map

To Be Determined, Beaumont, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.