Published September 4, 2024 at 8:00 PM

Updated September 5, 2024

Site work for a civil project in Harris, Minnesota. Working plans call for site work for a water / sewer project.

*As of September 4, 2024 bids received were rejected as they were over the budget. No definite date for rebid. Well 3 Watermain and Treatment Plant Modifications. No bidder may withdraw their bid within 60 days after the actual date of the opening thereof. Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages. Description: The Project includes the following Work: Bid A - Well #3: The construction, test pumping, and analytical sampling of a new community well, as well as the installation of a submersible well pump and pitless unit. Bid A includes the abandonment of existing Well #1. Bid B - Watermain and Treatment Plant Modifications: The installation of connecting watermain and electric from the new community well to the existing water treatment facility, process mechanical upgrades, chemical feed upgrades, electrical and SCADA upgrades, site work, and erosion control. This project anticipates the use of DEED's Small Cities Development Program (SCDP). Attention of Bidders is particularly called to the requirements as to conditions of employment to be observed and minimum wage rates to be paid under the contract, Section 3, and HUD 4010. A pre-bid conference will not be conducted for this Project. Owner reserves the right to waive any informalities or to reject any or all bids. Question Deadline 06/18/2024 Questions received less than seven days prior to the date for opening of Bids may not be answered.

Final Planning

Water / Sewer

$300,000.00

Public - City

Site Work

28

21

25

7

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
3
Bidding Soon
982
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

March 4, 2025

Project location map

To Be Determined, Harris, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.