Site work for a water / sewer project in Carrollton, Alabama. Completed plans call for site work for a water / sewer project.
The Project consists of demolition, excavation, drainage structure installation, erosion control, and cement flume construction. Bids will be received for a a single prime contract. Bids shall be on a lump sum and unit price basis, as indicated in the Bid Form. Bids shall be accompanied by a bid security in accordance with the Instructions to Bidders. The successful Bidder must furnish Performance and Payment Bonds in accordance with the Contract Documents. All Bidders shall make good faith efforts, as defined by Appendix A of 49 CFR Part 26, Regulations of the Office of the Secretary of Transportation, to subcontract a minimum of 6.37% of the dollar value of the prime contract to small business concerns owned and controlled by socially and economically disadvantaged individuals (DBE). Goals for minority participation for each trade: 20.7% Goals for female participation in each trade: 6.9% The PICKENS COUNTY COMMISSION reserves the right to reject any or all Bids, to waive irregularities in the Bids and bidding deemed to be in the best interests of the PICKENS COUNTY COMMISSION, and to reject nonconforming, nonresponsive, or conditional bids. Bid Bond required at five percent (5%) of the Total Bid amount. DBE Goal is 6.37%. Liquidated Damages are $500.00 per calendar day of delay. This item shall consist of modification of existing drainage structures, and the removal and satisfactory disposal of utility poles; trees, stumps, roots, buried logs, brush, grass, and other unsatisfactory materials; roadway pavements; water and sewer lines; signs, sign supports, sign foundations; curb and curb and gutter; driveways; guardrail; retaining walls; manholes; drainage structures (including reinforced concrete channels, headwalls, and wingwalls); concrete or masonry foundations (including foundations of poles or signs to be removed) or slabs; and concrete ducts and pipe culverts, all of which are not designated or permitted to remain. While an attempt has been made to outline all structures included in the plans, all structures required to be removed may not be designated as such in the plans. The Contractor shall make his own estimate of the work required for the removal of structures which conflict with the proposed construction.
Post-Bid
Water / Sewer
$920,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 07 - Thermal and Moisture Protection
Division 23 - Heating Ventilating and Air Conditioning
Division 26 - Electrical
Division 27 - Communications
Division 28 - Electronic Safety and Security
Division 31 - Earthwork
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 34 - Transportation
Division 40 - Process Interconnections
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 20, 2024
July 22, 2024
Multiple Locations, Carrollton, AL
Related To This Project
Carrollton, AL
Bid Date: Oct 17 2024
Carrollton, AL
Bid Date: Jan 23 2025
Carrollton, AL
Bid Date: May 13 2025
Carrollton, AL
Bid Date: May 22 2025
Carrollton, AL
Bid Date: May 30 2025
Carrollton, AL
Bid Date: Apr 25 2024
Carrollton, AL
Bid Date: Apr 25 2024
Carrollton, AL
Bid Date: Jul 14 2022
Carrollton, AL
Bid Date: Feb 16 2023
Carrollton, AL
Bid Date: Apr 29 2022
Carrollton, AL
Bid Date: Sep 01 2022
Carrollton, AL
Bid Date: Oct 19 2022
Mobile, AL
Bid Date: Jul 09 2024
Northport, AL
Bid Date: Jun 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.