BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Ridgewood, New Jersey. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Each Bid Must Be Enclosed in a Sealed Envelope With the Name of the Bidder Thereon and Endorsed, Rebid Kingsbridge Lane Pedestrian Bridge Structural Repair, in the Village of Ridgewood and Must Be Accompanied by the Following: a Certified Check, Cashier's Check, or Bid Bond (Schedule B), Drawn to the Order of the Village of Ridgewood for Ten Percent (10%) of the Amount Bid, or $20,000, Whichever is Less; a Consent of Surety (Schedule a); a Corporation or Partnership Statement (Schedule C); a Non-collusion Affidavit (Schedule D); a Statement of Responsibility (Schedule E); Disclose of Investment Activities in Iran (Schedule I); and the Certification of Non-debarment (Schedule J). Any Award or Awards May Be Made at a Later or Subsequent Time or Meeting of the Village Council. All Required Schedules, That is Schedule a, B, C, D, E, F, I, and J Are Required to Be Submitted on the Forms Attached to the Bid Documents. No Other Forms Will Be Accepted. The Principal Items of the Work of the Project Are the Rehabilitation of the Pedestrian Bridge at the End of Kingsbridge Lane That Crosses From Kingsbridge Lane Over the Saddle River to East Saddle River Road. The Work Can Be Done Under Two Options. The Contractual Obligation of the Village of Ridgewood Under This Contract for These Items is Contingent Upon the Availability of Appropriated Funds From Which Payment for This Contract Can Be Made. Prices Quoted Must Be Net and Exclusive of All Federal, State and Local Sales and Excise Taxes. Bids May Be Submitted in Person or by Mail Prior to the Bid Opening, Addressed to the Office of the Village Clerk. The Village Assumes No Responsibility for Loss or Non-delivery of Any Bid Sent to It Prior to the Bid Opening. The Successful Bidder Shall Furnish and Deliver to the Village of Ridgewood a Performance and Payment Bond in the Amount of 100 Percent of the Accepted Bid Amount as Security for the Faithful Performance of the Contract. Additionally, the Successful Bidder Shall Furnish Policies or Certificates of Insurance Required by the Contract. In Default Thereof, Said Checks and/or Bid Bond and the Amount Represented Thereby Shall Be Forfeited to the Village of Ridgewood as Liquidated Damages, Not as a Penalty.

Award

Bridges / Tunnels

$455,820.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
503
Active Projects
236
Bidding Soon
4,590
All Active Projects
2,105
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 24, 2024

October 24, 2024

img_map_placeholder

Kingsbridge Ln, Ridgewood, NJ

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.