BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Newington, New Hampshire. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of July 10,2024, this project has not yet been awarded. The project is expected to be awarded on July 16,2024. The Town of Newington, NH is soliciting proposals for roadway paving. Proposals shall be based on a per ton price, itemized with estimated tonnage by proposed streets. The intent of this bid is to hire a contractor to resurface a portion of Shattuck Way in the Town of Newington. Location and Specifications: Shattuck Way from construction joint near River Road to joint near Newington Energy, approximately 2,600 LF. 36-feet of pavement width shall be provided through the work limits. 1. Installation of temporary erosion control measures at catch basin and adjacent to wetlands where as needed. 2. Repair roadside drainage swales and roadway shoulders to ensure that positive drainage away from roadway system is maintained as needed. 3. Remove all utility manholes that have been abandoned. Manhole concrete covers shall be removed. Bottom of structure crushed. Structure to be removed to 30-inches below finish grade. Structure to be backfilled and compacted with crushed gravel. 4. Reset all existing vertical granite curb in work limits to have 7-inch reveal. Curb to be backfilled with 3,000 psi concrete. 5. Reclamation of existing roadway, a minimum of 10" depth from construction joint near River Road to joint near Newington Energy, approximately 2,600 LF. Add 150 lb/sy of crushed stone to base and grade roadway base to 2.5 to 3% cross slope. Roadway is superelevated in areas. Contractor shall follow existing roadway crown. 6. Construct sawcut joints at roadway and driveway intersections. Work shall extend 10- feet down roadways and 5-feet down driveways. Driveways and roads shall have smooth transitions. Install joint sealer. 7. Adjust all gate valves, manhole covers, catch basins to finish grade. 8. Install joint sealer at all pavement cold joints. 9. Install tack coat between pavement courses. 10. Wearing course shall be milled to create a smooth transition 5 feet beyond milling limits. 11. Installation of 2.5" base course. 12. Installation of 2.0" binder course 50 gyration winter mix. 13. Installation of 1.5 inches wearing course 50 gyration. 14. Loaming, seeding and revegetating of disturbed areas. 15. Remove temporary erosion control measures after disturbed areas are stabilized. 16. Gravel shoulders applied The Town of Newington reserves the right to reject any and all proposals and to waive any informalities or irregularities in procedure. All questions to be directed to Len Thomas, Road Agent at 603-396-1816 or Martha Roy at 603-436-7640 ext 6 The Town of Newington reserves the right to accept or reject any and/or all proposals and waive technicalities for whatever reason is considered to be in the best interest of the Town. Delivery: Application to be prior to October 30, 2024 at a mutually agreed upon time.

Award

Roads / Highways

$598,168.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
121
Bidding Soon
2,093
All Active Projects
847
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2024

July 29, 2024

img_map_placeholder

Shattuck Way, Newington, NH

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.