BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Grand Rapids, Michigan. Completed plans call for the renovation of a municipal facility.

Allows zero unit prices and labor No Allows negative unit prices and labor No The undersigned as bidder proposes to do all the work of: Replacement of Electrical Substation and Switch Gear at the CITY-COUNTY COMPLEX and to furnish all parts, labor, materials, supplies, equipment and other facilities and things necessary and proper for and incidental to the proper performance and completion of the work specified in the Contract Documents, including the drawings and specifications and as required by the City Manager and City Engineer to begin construction within seven (7) calendar days after a Contract is executed (unless otherwise indicated in the Special Provisions) and to complete the work by the date(s) listed below, and for the unit prices stated in the Bid Form. Addenda, if any have been issued, are to be acknowledged on the form provided at the place where bids are received, and a signed copy attached to the bid. Substantial Completion Date: April 24, 2026 Final Completion Date: June 5, 2026 This work consists of The replacement of the main substation and switchgear for 300 Monroe Ave NW. The City's Mission Statement and Sustainability Vision Statement, defines the purpose of the Equal Business Opportunity (EBO) - Construction Policy and Administrative Guidelines (1) provide equitable access to do business with the City; (2) encourage involvement in the City's Sustainability Vision Statement themes; and (3) enhance the growth, development and participation of small and emerging businesses to perform on City construction contracts. The EBO - Construction Policy and Administrative Guidelines include bid discount provisions. A contractor's bid may be discounted when the contractor can demonstrate and substantiate their involvement in practices that further the City's Mission Statement and Sustainability Vision Statement. Section 5 of the Administrative Guidelines for the EBO - Construction Policy describes the City's bid discount provisions and has been expanded to include additional discount point opportunities by employing graduates from construction entry programs. Bidders and subcontractors must comply with the City of Grand Rapids prequalification and certification requirements. The successful bidder for the above project may not discriminate against any employee or job applicant in any matter related to employment because of actual or perceived color, race, religion or creed, sex, gender identity or expression, sexual orientation, national origin, genotype, age, marital status, familial status, medical condition, disability, height, weight, or source of lawful income and the successful bidder will be required to insert that provision in all subcontracts relating to the project. The successful bidder will be required to have a policy regarding Drug Free Workplace and certify to the City that this policy is in place. A certified check or bid bond for a sum not less than five percent (5%) of the amount of the Bid will be required with each bid. No bid may be withdrawn for a period of 45 calendar days after the date and time for receiving bids. The City reserves the right to accept or reject any and all Bids; to reject the Bid of a Bidder who is not, in the opinion of the Engineer or City, in a position to perform the contract; to waive informalities, irregularities and technicalities; to reject any and all non-conforming, non-responsive, unbalanced [unreasonable unit price(s)] or conditional Bids; or to advertise for new Bids. The City also reserves the right to award the Contract in the City's best interest, and therefore, may select a Bidder other than the lowest. Question Deadline 06/25/2024 Questions received less than 5 business days prior to the date for opening of Bids will not be answered.

Award

Municipal

$3,364,777.00

Public - City

Renovation

38

20

7

5

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
108
Bidding Soon
1,255
All Active Projects
469
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 2, 2024

September 2, 2024

June 5, 2026

img_map_placeholder

300 Monroe Ave NW, Grand Rapids, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.