BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a municipal facility in Los Angeles, California. Completed plans call civil work for an office development.

. CONTRACTOR SHALL REMOVE EXISTING SELECTED ACCESS CONTROL DEVICES, CONTROLLERS AND POWER SUPPLIES, AS INDICATED IN THE CONTRACT DRAWINGS. 2. CONTRACTOR SHALL PROVIDE AND INSTALL NEW HIGH-SPEED DOORS AND OVERHEAD COILING DOORS AS INDICATED IN THE CONTRACT DRAWINGS. 3. CONTRACTOR SHALL PROVIDE AND INSTALL NEW EMPLOYEE PARKING PEDESTRIAN GATES INCLUDING, BUT NOT LIMITED TO, CONCRETE SIDEWALK, RETAINING WALLS, CONCRETE CURBS, HANDRAILS, FENCING, FULL HEIGHT TURNSTILES, AND ABA SWING GATE. 4. CONTRACTOR SHALL RECONFIGURE EXISTING TRUCK GATE 1 INCLUDING, BUT NOT LIMITED TO, FENCE, GATES, GUARD SHACK, STEEL BOLLARDS AND PEDESTALS DEMO, REMOVAL AND DISPOSAL; CONCRETE AND/OR ASPHALT PAVING REPLACEMENT AS REQUIRED; NEW CHAIN LINK FENCING; NEW SLIDING AND BIFOLD GATES; NEW GATE OPERATORS; NEW STRIPING AND PAVEMENT MARKINGS; NEW STEEL PEDESTALS AND BOLLARDS, NEW CONCRETE ISLANDS; NEW ALUMINUM POLES AND ASSOCIATED CONCRETE BASES; NEW PRE-FABRICATED GUARD SHACK WITH HVAC UNIT AND ASSOCIATED POWER SUPPLY. 5. CONTRACTOR SHALL EXPAND EXISTING EPACS SYSTEM INCLUDING, BUT NOT LIMITED TO, ACCESS CONTROL UNITS, CARD READERS, READER INTERFACES, ELECTRIC STRIKES, MAGNETIC LOCKS, DOOR CONTACTS, DOOR ALARMS, REQUEST FOR EXIT DEVICES, AND NETWORK PORTS. 6. CONTRACTOR SHALL PROVIDE AND INSTALL ELECTRICAL POWER TRANSFER DEVICES, ELECTRICAL HINGES AND ANY OTHER ITEMS AS REQUIRED TO PROVIDE POWER TO REX (PUSH BARS), ELECTRIC STRIKES, AND/OR ELECTRIC LATCHES, TYPICAL. 7. CONTRACTOR SHALL REMOVE EXISTING, ANALOG -LEGACY CCTV SYSTEMS AND SHALL EXPAND EXISTING, STAND-ALONE, IP BASED CCTV SYSTEM INCLUDING, BUT NOT LIMITED TO RACEWAY, CAMERAS, POLES AND CAMERA MOUNTING DEVICES, WIRING, NODES, HEAD END EXPANSION, CABINETS, AND MONITORS. 8. CONTRACTOR SHALL PROVIDE AND INSTALL NEW INTERCOM SYSTEM INCLUDING, BUT NOT LIMITED TO, NETWORK SWITCHES, MASTER INTERCOMS, INTERCOM DOOR STATIONS, POWER SUPPLIES, RACEWAY AND WIRING. 9. CONTRACTOR SHALL PROVIDE AND INSTALL NEW CONDUIT AND WIRING AS INDICATED. CONTRACTOR MAY REUSE EXISTING WIRING CONDUIT WHERE FOUND IN ACCEPTABLE CONDITIONS. CONTRACTOR SHALL PERFORM CONCRETE AND/OR ASPHALT PAVING DEMO AND REPLACEMENT AS REQUIRED AND SHALL MATCH EXISTING MATERIALS, FINISH AND GRADE. *Unit Pricing and Allowances for re-using tested cabling. C. ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CODES AND LOCAL REGULATIONS THAT MAY APPLY. IN CASE OF CONFLICT IN OR BETWEEN THE CONTRACT DOCUMENTS AND A GOVERNING CODE OR ORDINANCE, THE MORE STRINGENT STANDARD SHALL APPLY. 011000-1 LOS ANGELES P&DC Security Upgrades 11/06/2023 SUMMARY OF WORK SECTION 011000 SUMMARY OF WORK PART 1 - GENERAL 1.1 SCOPE A. The Contractor must provide all material, labor, tools, plant, supplies, equipment, transportation, superintendence, temporary construction of every nature, and all other services and facilities necessary to complete the construction of a postal facility for the Postal Service, including all incidental work described in the contract documents. B. The scope of work is attached to the Contract and as described below: 1. Contractor shall remove existing selected access control devices, controllers and power supplies, as indicated in the contract drawings. 2. Contractor shall provide and install new high-speed doors and overhead coiling doors as indicated in the contract drawings. 3. Contractor shall provide and install new employee parking pedestrian gates including, but not limited to, concrete sidewalk, retaining walls, concrete curbs, handrails, fencing, full height turnstiles, and ABA swing gate. 4. Contractor shall reconfigure existing Truck Gate 1 including, but not limited to, fence, gates, guard shack, steel bollards and pedestals demo, removal and disposal; concrete and/or asphalt paving replacement as required; new chain link fencing; new sliding and bifold gates; new gate operators; new striping and pavement markings; new steel pedestals and bollards, new concrete islands; new aluminum poles and associated concrete bases; new pre-fabricated guard shack with HVAC unit and associated power supply. 5. Contractor shall expand existing EPACS system including, but not limited to, access control units, card readers, reader interfaces, electric strikes, magnetic locks, door contacts, door alarms, request for exit devices, and network ports. 6. Contractor shall provide and install electrical power transfer devices, electrical hinges and any other items as required to provide power to rex (push bars), electric strikes, and/or electric latches, typical. 7. Contractor shall remove existing, analog -legacy CCTV systems and existing ISIP head end, and shall provide a new ISIP CCTV system including, but not limited to, raceway, cameras, poles and camera mounting devices, wiring, nodes, head end, cabinets, and monitors. Contractor shall adjust, relabel and tie in existing cameras to new head end. 8. Contractor shall provide and install new intercom system including, but not limited to, network switches, master intercoms, intercom door stations, power supplies, raceway and wiring. 9. Contractor shall provide and install new conduit and wiring as indicated. Contractor may reuse existing wiring conduit where found in acceptable conditions. Contractor shall perform concrete and/or asphalt paving demo and replacement as required and shall match existing materials, finish and grade. C. All work shall be in accordance with applicable codes and local regulations that may apply. In case of conflict in or between the Contract Documents and a governing code or ordinance, the more stringent standard shall apply. 1.4 USPS DIRECT VENDOR EQUIPMENT OR SUPPLIES NOT USED 011000-2 LOS ANGELES P&DC Security Upgrades 11/06/2023 SUMMARY OF WORK 1.5 USPS PRE-APPROVED VENDOR EQUIPMENT OR SUPPLIES NOT USED 1.6 MISCELLANEOUS EQUIPMENT CROSS-REFERENCE LIST NOT USED PART 2 - PRODUCTS NOT USED PART 3- EXECUTION NOT USED END OF SECTION June 26, 2024, 12:00PM PST All request for Information (RFI) questions must be in writing and submitted to: brian.lock@talionconstruction.com Contact: brian.lock@talionconstruction.com Contact: brian.lock@talionconstruction.com

GC Bidding

Municipal

$2,000,000.00

Public - Federal

New Construction, Site Work

86

20

23

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
216
Active Projects
101
Bidding Soon
2,232
All Active Projects
984
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2024

August 19, 2024

img_map_placeholder

7001 S Central Ave, Los Angeles, CA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.