Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 25, 2024 at 8:00 PM

Updated November 27, 2025

Site work and paving for a civil project in Petty Harbour, Newfoundland. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Closing Time: 2:00 PM NT Question Acceptance Deadline: 2024/06/23 02:00:00 PM NDT The scope of work under this contract generally includes, but is not limited to, all labour, materials, and equipment for the construction of new ditching and controlled storm water runoff measures that will prevent further erosion and reinstate the roadway material that has been removed by erosion over the years to provide protection for the existing water main. These new ditching and erosion control measures along Motion Bay Road Extension will combine with the existing drainage along both sides of Ocean View Boulevard. The project will include the supply and installation of approximately 350 m³ of imported common backfill, approximately 210 m³ of new channel excavation, upgrading the existing gravel road c/w new ditching, the supply and placing of approximately 150 m³ of Class "A" granular material, the supply and installation 38m of new culverts and 1 ditch inlet, reinstatement with topsoil and hydroseeding and associated work. The bid bond shall be at least ten percent (10%) of the bid amount (without HST). All bids, regardless of monetary value require a Bid Security of at least ten percent (10%) of the bid amount (without HST), with a minimum security of five hundred dollars ($500.00). A Performance Bond will be required in the amount of fifty percent (50%) of the contract price (exclusive of HST). The Performance Security is to be received not later than fourteen (14) calendar days after the award of the contract and prior to the formal execution of the agreement. No work is to be undertaken until the Performance Security has been received. Performance Security will not be required for a contract value of less than $25,000. A Labour and Materials Payment Bond will be required in the amount of fifty percent (50%) of the contract price (exclusive of HST). The Labour and Materials Payment Bond is to be received not later than fourteen (14) calendar days after the award of the contract and prior to the execution of the formal agreement. No work is to be undertaken until the Labour and Materials security has been received. Labour and Materials security will not be required for a contract valued at less than $25,000. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Roads / Highways

Public - City

Paving, Site Work

11

3

2

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
16
Bidding Soon
274
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2024

July 25, 2024

Project location map

Motion Bay Rd, Petty Harbour, NL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed