BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 26, 2024 at 8:00 PM

Updated July 27, 2024

Site work for a mixed-use development in Palmer, Massachusetts. Completed plans call for site work for a educational facility; and sidewalk / parking lot.

Performance of selective demolition of 45 ft. of structural 12" block wall; approximately 5 courses from top. Addition of vertical steel reinforcement and subsequent grouting where possible. Reconstruction of approximately 45 ft. of demolished wall section with new 12" concrete block and type S mortar. Form and pour new 4000 psi, steel reinforced concrete cap. Installation of 45 feet of ADA compliant railing which will be provided by district. PROJECT ADDRESS: 240 Sykes Street Palmer, Ma. 01069 Bidding requirements dictated by M.G.L. c. 149 requirements for projects between $10,000 and $50,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. GENERAL SCOPE OF WORK DESCRIPTION Performance of selective demolition of 45 feet of structural 12" block wall; approximately 5 courses from top. (Upon completion of inspection of air exchanger cavity below concrete ramp and supported by aforementioned wall to determine structural shoring needs and demolition process); In order to remove compromised and failing wall sections for reconstruction. Addition of vertical steel reinforcement and subsequent grouting where possible of remaining wall prior to reconstruction. Reconstruction of approximately 45 feet of demolished wall section with new 12" concrete block and type S mortar (to base of ramp). Reconstructed wall will feature vertical steel reinforcement @48" increments, anchored into remaining wall and featuring full length horizontal bond beam course with continuous rebar @ existing to new wall transition height. Form and pour new 4000 psi, steel reinforced concrete cap with 1 1/2 " overhang atop block wall @ completed height. Installation of 45 feet of ADA compliant railing which will be provided by district. QUESTIONS: All quote related questions should be emailed to the Gregory J. Falcone, Business Manager to equipbid@pathfindertech.org. NOT TO EXCEED PRICE/QUOTE: $24,000.00

Award

Sidewalks / Parking Lot

$24,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
707
Active Projects
297
Bidding Soon
5,251
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2024

July 29, 2024

Project location map

240 Sykes St, Palmer, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.