BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 10, 2024 at 8:00 PM

Updated September 11, 2024

Renovation of a residential development in Boston, Massachusetts. Completed plans call for the renovation of a residential development.

Roof Replacement Project at Lower Mills Housing Corporation. HVAC & Electrical Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Technical questions may be directed to Richard Gorham, Email richard.gorham@socotec.us. The latest date for the AE to receive questions will be June 21, 2024. Email queries regarding BHA bids may be directed to bids@bostonhousing.org. email queries regarding BHA bids may be directed to bids@bostonhousing.org Minority Workforce Goals. The Contractor and each of its Subcontractors shall take affirmative action to employ and maintain Minority workers that perform a total of FORTY PERCENT (40 %) of the total employee person hours under the Contract. B. Women Workforce Goals. The Contractor and each of its Subcontractors shall take affirmative action to employ and maintain Women workers that perform a total of TWELVE PERCENT (12 %) of the total employee person hours under the Contract. Agency-wide Goals. The BHA's goal for the utilization of MBEs is TWENTY PERCENT (20 %). The Contractor for supplies or services unrelated to construction shall take affirmative action to expend twenty percent of the Contract price to MBEs for the procurement of goods, supplies, and/or services under the Contract if the nature of the Contract permits. 2. Construction & Design Work Goals. The Project goal for the utilization of MBEs for construction and construction design is TWENTY-FIVE PERCENT (25 %). The Contractor shall take affirmative action to expend twenty-five percent of the Contract price to MBEs to procure construction work, supplies, and goods and/or services for the Project under the Contract. The Contractor can self-perform as an MBE or joint-venture with MBEs, subcontract to MBEs, or purchase materials/goods or other services from MBEs. Agency-wide Goals. The BHA's goal for the utilization of WBEs is FIFTEEN PERCENT (15 %). The Contractor for supplies or services unrelated to construction shall take affirmative action to expend fifteen percent of the Contract price to WBEs for the procurement of goods, supplies, and/or services under the Contract if the nature of the Contract permits. 2. Construction & Design Work Goals. The Project goal for the utilization of WBEs for construction and construction design is FIFTEEN PERCENT (15 %). The Contractor shall take affirmative action to expend fifteen percent of the Contract price to WBEs to procure construction work, supplies, and goods and/or services for the Project under the Contract. The Contractor can self-perform as a WBE or joint-venture with WBEs, subcontract to WBEs, or purchase materials/goods or other services from WBEs.

Bid Results

Residential Subdivision

$1,196,660.00

Public - City

Renovation

17

18

2

8

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
531
Active Projects
249
Bidding Soon
3,617
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

September 16, 2024

Project location map

2262 Dorchester Ave, Boston, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.