Site work and paving for a mixed-use development in San Antonio, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

2024 Non-Service Alley Improvements TOC Pkg. B. Estimate: $2,000,000.00. Scope Typical work activities anticipated for this contract relate to non-service alley projects to alleviate minor ponding issues associated with non-service alleys. Construction efforts may include: regrading, leveling, clearing, or implementation of asphalt, sidewalks, driveways, concrete curbs, striping, signs, utility repairs and adjustment, necessary to complete non-service alley projects. Question Deadline 06/26/2024 at 4:00 PM CT. PROJECT SCOPE 1.1.1 The main objective of this Task Order Contract is to provide maintenance improvements to Non-Service Alleys identified within City of San Antonio. Note that the existing condition of alleys does vary. The identified application for the alleys is summarized below: A. Unpaved Alleys - Unpaved alleys identified with this task order are to be re-graded, as applicable, and 3 of Flexible Base is to be installed as noted and depicted in TOC details. B. Paved Alleys in Poor to Fair Condition - Paved alleys identified with this task order that are in poor to fair condition will have a 2 Mill and Overlay Application as noted and depicted in TOC details. C. Paved Alleys in Good Condition - Paved alleys identified with this task order that are in good condition will have a Slurry Seal application as noted in TOC specifications. 1.1.2 Typical work activities anticipated for this contract relate to storm water nonservice alley projects whose construction may include: alley improvements and street reconstruction items, such as pavement, sidewalks, driveways, concrete curbs, and signs which are necessary to complete storm water non-service alley projects. 1.1.3 Project construction may include but is not limited to concrete riprap, flowable fill, structural excavation, street and alley excavation, sidewalks, driveways, concrete curbs, concrete retaining walls- combination type, street reconstruction, wheelchair ramps, asphalt replacement, topsoil, sodding, concrete steps, signage, service laterals and any other items required due to the site conditions to accomplish the project scope.

Bid Results

Sidewalks / Parking Lot

$1,895,980.00

Public - City

Paving, Site Work

11

17

2

8

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
25
Bidding Soon
1,953
All Active Projects
762
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.