BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Wauwatosa, Wisconsin. Completed plans call for site work for a water / sewer project.

Wauwatosa West Zone Pumping Station Under this proposal, the Contractor shall furnish all labor, materials, supplies, equipment, tools and other services necessary for the construction work and all work incidental thereto, all in accordance with contract documents.. The contractor will perform this work at the site location at 11501 W. Burleigh Street, Wauwatosa, WI, 53222. Deadline to submit questions via online will be June 19, 2024. All proposals must be submitted in electronic format together with a bid bond equal to five (5) percent of the bid payable to the City of Wauwatosa, Wisconsin, as a guarantee that if his bid is accepted, the successful bidder will execute and file the proper contract and bonds within ten (10) days after notification of award of the contract. Failure on the part of the successful bidder to execute his contract and performance and labor & material payment bonds within ten (10) days from the date of notice of the award of contract will be considered as just cause for the annulment of the award and the forfeiture of the proposal guarantee to the City not as a penalty but in payment to the City as liquidated damages as a result of such failure. No bid shall be withdrawn after the opening of bids for a period of sixty (60) days after the scheduled time of closing of bids. TIME OF SUBSTANTIAL COMPLETION The substantial completion date for CONTRACT 24-56 WAUWATOSA WEST ZONE PUMPING STATION shall be August 28, 2026. See Section 600 for additional completion requirements. If the contractor does not complete the work on or before the date set forth above for CONTRACT 24-56 WAUWATOSA WEST ZONE PUMPING STATION or within the extra time allowed under a City Engineer granted time extension, the City will assess liquidated damages. The City will deduct Five Thousand Dollars ($5,000.00) for every calendar day that the work remains uncompleted from payments due the contractor. The Contractor will also be charged for each and every day inspection is required after the time of completion has expired. This charge will be based on the actual costs of inspection, construction supervision, clerical and administrative costs, traffic control and overhead charges. A required "Affidavit of Compliance" is included in Section 300 and must be submitted with the bid. The right to reject or accept any or all bids and the right to waive any informality in bidding is reserved to the City of Wauwatosa, Wisconsin. Pre-Qualification: Yes

Award

Water / Sewer

$4,394,780.00

Public - City

Site Work

86

28

37

5

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
104
Bidding Soon
2,601
All Active Projects
945
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 26, 2024

July 26, 2024

August 28, 2026

img_map_placeholder

11501 W Burleigh St, Wauwatosa, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.