Site work and paving for a mixed-use development in Center Line, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000357363 The City of Center Line is upgrading existing watermain crossings on 10 Mile Rd. using "Directional Drilling" methods and replacing gatewells and gatevalves, in preparation for the reconstruction of that thoroughfare through the city in the Spring of 2025. This project must be completed prior to the 10 Mile Rd. reconstruction. This project is not a Federally funded project. The approximate quantities involved in this work are as follows: Water Main, HDPE, SDR-11, 12 inch Directional Drill 80 Ft Water Main, HDPE, SDR-11, 16 inch Directional Drill 72 Ft Water Main, HDPE, SDR-11, 8 inch Directional Drill 321 Ft Gate Well, 60 inch dia 8 Ea Gate Well, 72 inch dia 1 Ea Gate Valve, 8 inch 7 Ea Gate Valve, 12 inch 1 Ea Gate Valve, 16 inch 1 Ea and related work as well as pavement replacement, sidewalk replacement, traffic control, restoration and final clean up as well as deliverables. Question Acceptance Deadline 07/18/2024 12:00 PM EDT Questions are submitted online No General Requirements - Bid Deposit Required - Contractors License Required - Installation Required - Insurance Required - License Required - Onsite Maintenance Required - Safety Standards Plan - Warranty Information Required PRE-QUALIFICATIONS The Prime Contractor shall demonstrate that they have successfully completed projects in the last five (5) years of equal scope in the State of Michigan and each totaled more than $500,000 minimum per year. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Surety Bond 100 % - Labor and Materials Bond 100 % - Payment Bond 100 % -- Each proposal shall be accompanied by a certified check in the amount of five percent (5%) of the proposal, payable to the City of Center Line Treasurer, as security for the acceptance of the contract. A bid bond on the Michigan Standard Form, issued by an approved Surety Company, may be furnished in lieu of a certified check. WITHDRAWAL OF BIDS No bidder may withdraw his proposal within sixty (60) calendar days after the date set for opening thereof. This time frame may be adjusted through material agreement between the Owner and Contractor. *The right to accept any bid, to reject any or all proposals and to waive irregularities in bidding is reserved by the City of Center Line. Portions of this Contract may be deleted due to unforeseen circumstances without compensation. Acceptance of any bid does not constitute a binding agreement until a written Contract is signed by both parties.

Bid Results

Sidewalks / Parking Lot

$689,540.00

Public - City

Paving, Site Work

12

14

5

5

Subscribe For Documents

82 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
327
Active Projects
193
Bidding Soon
2,678
All Active Projects
1,073
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 30, 2024

September 30, 2024

November 30, 2024

img_map_placeholder

E 10 Mile Rd, Center Line, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.