Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Springfield, Missouri. Contact the soliciting agency for additional information.
No conference scheduled. All proposals shall be irrevocable for ninety (90) days after the time for opening of proposals. The scope of work for this project is the complete re-gasketing of the 25 MVA, 161/4.16 kV Station Service Transformer at JTEC 1 generating facility, including testing, oil processing, inspection and other related services as required. Refer to Section VII Technical Specification Questions should be directed to: James Griffith Purchasing Department Senior Buyer City Utilities of Springfield, Missouri james.griffith@cityutilities.net [E] purchasing@cityutilities.net Anticipated commencement date of work 10/07/2024 Each proposal must be accompanied by a Bid Bond with an adequate surety, naming the City Utilities of Springfield, Missouri, as obligee, in a penal sum equal to five percent of the maximum bid price excluding options, or in lieu thereof, a certified check drawn on a Federally insured banking institution, payable to City Utilities in the same amount as the penalty of the Bond. The Bond or Check shall be conditioned that should a bidder, after award, fail to enter into a contract, then the entire amount of the Bond or Check shall become the property of the City Utilities, or City Utilities shall be entitled to recover the entire penal sum of the Bond or Check without further proof of damage. Bid Checks will be returned to all unsuccessful bidders within a period of thirty days following contract execution. Successful Bidder shall furnish a Performance and Payment Bond as security for the faithful performance and payment of all their obligations under the Purchase Order (Contract) and Section 107.170 R.S.Mo. The Bond shall be in the amount of the proposal and in the form provided herein and with such sureties as are licensed to conduct business in the State of Missouri and are named in the current list of "Surety Companies acceptable on Federal Bonds" as published in the Federal Register by the Audit Staff Bureau of Accounts, U.S. Treasury Department, and as acceptable reinsuring companies as published in the Federal Register by the department of the Treasury. If the surety on any Bond furnished by Bidder (Contractor) is declared bankrupt or becomes insolvent or its rights to do business is terminated or revoked in any state where any of the project is located, bidder (Contractor) shall within five days thereafter substitute another bond and surety, both of which shall be acceptable to City Utilities. The bond shall be filed with City Utilities within ten days unless superseded in the Request for Proposal documents. The Bond shall be approved prior to the start of work.
Post-Bid
Power Plant
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2024
October 7, 2024
5100 W Farm Rd 164, Springfield, MO
Related To This Project
Springfield, MO
Bid Date: Jun 26 2024
Springfield, MO
--
Springfield, MO
Bid Date: Jul 11 2024
Springfield, MO
Bid Date: Jun 19 2024
Springfield, MO
Bid Date: Jul 17 2024
Springfield, MO
Bid Date: Jun 25 2024
Springfield, MO
Bid Date: Jul 19 2024
Springfield, MO
Bid Date: Jul 10 2024
Springfield, MO
Bid Date: Jul 16 2024
Springfield, MO
--
Springfield, MO
Bid Date: Jun 27 2024
Springfield, MO
Bid Date: Jul 09 2024
Springfield, MO
Bid Date: Jul 09 2024
Springfield, MO
Bid Date: Aug 13 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.