Site work and paving for a mixed-use development in Morro Bay, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Scope of Work: General work description: The work shall include, but is not limited to, providing all tools, materials, labor, equipment, and incidentals necessary for the removal of a 36" CMP Storm Drainpipe, replacement with a 36" HDPE storm drainpipe, connection to existing headwall, laterals, and storm drain manhole, curb & gutter, sidewalk, curb opening catch basin, pavement restoration, and specified hardscape restoration. All utilities not replaced will be protected in place including manholes and returned to their prior condition. The work will also include any required traffic control, signage, public notifications, stormwater control, shoring, formwork, and all other work necessary to render the infrastructure/facility complete and operational, as shown on the Project Plans and Specifications, as specified herein, and in accordance with City of Morro Bay Standard Specifications and Drawings, Caltrans Standard Specifications, and Greenbook with whichever is more restrictive applying if a conflict arises. Requests for information or clarification and any questions must be submitted IN WRITING and received in the Department of Public Works no later than 5:00 p.m. on Friday, June 28, 2024. Requests may be submitted via e mail addressed to: Austin Della - Senior Civil Engineer adella@morrobayca.gov The Engineering Division has calculated an estimate of probable construction costs for this project. The City does not wish to publicize the engineer's estimate of the project cost since this information may tend to influence the number and nature of bids received. However, for the bidder's convenience, the Engineer's Estimate for the base bid falls within a range of $300,000 to $400,000. The allotted time of construction for this project is NINETY (90) WORKING DAYS. A WORKING DAY is every weekday, except legal holidays as defined in Section 1-2 T. of the Special Provisions. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$394,400.00

Public - City

Paving, Site Work

6

7

9

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
21
Active Projects
8
Bidding Soon
201
All Active Projects
89
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2024

August 9, 2024

img_map_placeholder

Sequoia Ct, Morro Bay, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.