BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Fort Wayne, Indiana. Completed plans call for site work for a bridge / tunnel; and water / sewer project.

The funding source for this project is STORMWATER, TIF. The Contractor shall furnish all labor, insurance, equipment, materials and power for the complete performance of the following project, Ardmore Avenue & Airport Expressway Phase III Stormwater Improvements asfollows: Installation of approximately 1,700 LF of storm sewers and culverts ranging in size from 12" - 48" in diameter, 1,500 LF of elliptical and box pipes ranging in size from 30"x19" up to 10' x 5', 1,800 LF of 6" underdrain, 9 structures, 15 end sections, appurtenances, grading an approximate 700 LF two-stage ditch channel, improvements to existing roadside ditches and swales in the project area, and final restoration of the site. Contract Times: Days A. The Work will be substantially complete within 300 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions. B. Work shall be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 360 days after the date when the Contract Times commence to run Pursuant to EPA Requirements, the City of Fort Wayne has established a fair share goal of 7% for MBEs and 5% for WBEs No Bid may be withdrawn for at least 60 days after the scheduled time for receipt of Bids so as to allow review of Bids before announcing award of Contract. The successful Bidder will be required to furnish a satisfactory Labor and Material Payment Bond and Performance Bond each in the amount no less than one hundred (100%) percent of the contract price.

Bid Results

Water / Sewer

$3,023,388.00

Public - City

Site Work

123

17

5

7

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
46
Bidding Soon
1,151
All Active Projects
438
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 11, 2024

August 12, 2024

August 7, 2025

img_map_placeholder

Airport Expy & Ardmore Ave, Fort Wayne, IN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.