BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Dallas, Texas. Completed plans call for site work for a water / sewer project.

August 30,2024, this project has not yet been awarded. A timeline for award has not yet been established. The purpose for this solicitation is to establish a thirty-six (36) month Indefinite Delivery/ Indefinite Quantity (ID/IQ) service agreement with two (2) one-year renewal options for Cured-in-Place Pipe (CIPP) and/or Cured-in-Place Manhole (CIPM) Rehabilitation. The City of Dallas is seeking companies whose combination of experience and personnel will provide professional services as required to fulfill all aspects of these specifications timely and in its entirety. Questions answered, submission deadline extended to July 19, 2024 at 1:00 PM Rehabilitation of Wastewater Main: The Contractor isrequired to install a flexible tube saturated with a thermosetting, sulfuric acid corrosion resistant, polyester, vinyl ester, or epoxy resin either inverted or pulled into the existing wastewater main, such that when properly cured extends from one manhole to the next in a continuous, tight-fitting, corrosion resistant, watertight pipe. The Contractor must use one of the following methods: 1. Inversion Method - Insert a resin impregnated tube into the existing wastewater main using an inversion standpipe under a hydrostatic head or air pressure. 2. Pull Method (for 6" - 12" pipes only) - Pull a resin impregnated tube into the existing wastewater main and expand with a calibration hose through the center and under pressure. Rehabilitation of Wastewater Manhole: The Contractor is required to install a chemical resistant CIPM liner. The liner must be multi-layered (three layers) and non-porous. It shall be a laminated structural system containing a non-porous membrane layered between two structural layers of woven roving fiberglass. The detailed requirements for CIPM are listed in Section IV-C (SPECIFICATION FOR SEWER MANHOLE LINING).

Bid Results

Water / Sewer

$7,173,511.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
65
Bidding Soon
3,545
All Active Projects
1,405
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

August 19, 2024

img_map_placeholder

To Be Determined, Dallas, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.