BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Broken Arrow, Oklahoma. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Site Address: 485 N. Poplar Ave. Site Directions: Houston Street from Garnett Road to Olive Avenue. The References, Statement of Qualifications & Experience and the Statement of Key Personnel Qualifications & Experience, using the forms found in Section II Proposal Documents, must be submitted with the bid and include, as a minimum, the information required herein. Failure to submit the information required in these documents may result in the City of Broken Arrow considering the Bid non-responsive and result in rejection of the Bid by the City of Broken Arrow. Bidders may be required to provide supplemental information if requested by the City of Broken Arrow to clarify, enhance or supplement the information provided in the References, Statement of Qualifications & Experience and/or the Statement of Key Personnel Qualifications & Experience. Such list shall be accompanied by a Statement of Qualifications & Experience as well as a Statement of Key Personnel Qualifications & Experience, using the forms found in Section II Proposal Documents, with pertinent information regarding similar projects and other evidence of qualification and experience for each such Subcontractor, Supplier, or other individual or entity. If City of Broken Arrow or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, City of Broken Arrow may, before the Notice of Award is given, request apparent successful Bidder to submit an acceptable substitute, within one (1) day of notification. St2028 - Houston Street Widening From Garnett Road to Olive Avenue: This Project Includes Roadway Improvements Including Milling and Overlaying Existing Asphalt and Adding New Asphalt for Widening on Houston Street From Garnett Road to Olive Avenue. The Pavement Configuration Will Include Two Through Lanes in Each Direction and a Center Turn Lane. The Project Includes 9,700 Cy of Unclassified Excavation; 2,200 Cy of Unclassified Borrow; 2,500 Lf of Temporary Silt Fence; 28,000 Sy of Solid Slab Sodding; 18,500 Sy of Subgrade Method B; 19,600 Sy of Separator Fabric; 25,000 Sy of Fabric Reinforcement W/ Bituminous Binder; 5,850 Tons of Superpave, Type S3; 4,100 Tons of Superpave, Type S4; 20,900 Sy of Cold Milling Pavement; 2,200 Sy of Dowel Jointed Pc Concrete; 5,805 Lbs. Of Reinforcing Steel; 11,500 Lf of 2'-2" Combined Curb and Gutter; 6,750 Sy of 4" Concrete Sidewalk; 1,750 Sy of 8" Concrete Driveway; 1,630 Lf of 24" Corrugated Polyethylene Pipe; 3,500 Sy of Removal of Asphalt Pavement; 2,360 Sy of Removal of Sidewalk; 1,880 Sy of Removal of Concrete Driveway; 8,000 Lf of Removal of Concrete Curb and Gutter; 12,000 Lf of Sawing Pavement; 19,000 Lf of Traffic Stripe (Multi-polymer, 4" Wide); 16,000 Lf of Construction Traffic Stripe (Paint, 4" Wide); 10,000 Ea of Construction Zone Pavement Markers (Flex Tabs); 1,000 Lf of Crack Sealing; 104,920 Lbs. Of Reinforcing Steel; and 1,715 Lf of 5/c Traffic Signal Electrical Cable. Total Contract Time for the Project Shall Be Three Hundred and Sixty (360) Calendar Days. If apparent Successful Bidder declines to make any such substitution, City of Broken Arrow may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. In such event, the next lowest Bidder shall, within two (2) days after requested by the City of Broken Arrow, submit to City of Broken Arrow the above required list of the Subcontractors, Suppliers, and other individuals or entities. In evaluating whether a Bidder is responsible, City of Broken Arrow will consider the qualifications and experience of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided above. As a Proposal Guarantee, a certified check, cashier's check, bid bond or irrevocable letter of credit issued by an insured financial institution as required by law must accompany each Proposal for an amount equal to five percent (5%) of the total Bid made payable, without reserve, to the City of Broken Arrow. The successful Bidder must, within ten (10) days after receiving notice of award, furnish a Performance Bond, Statutory Bond and Maintenance Bond in the forms prescribed by City of Broken Arrow in the amounts equal to the Contract price. For questions, please contact the Engineering & Construction Department by email at engineering.construction@brokenarrowok.gov or by phone at (918)250-7000 x5414.

Bid Results

Roads / Highways

$5,718,000.00

Public - City

Paving, Site Work

112

6

15

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
77
Bidding Soon
909
All Active Projects
455
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 10, 2024

September 10, 2024

September 19, 2024

img_map_placeholder

Houston St, Broken Arrow, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.