Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Highland, Utah. Contact the soliciting agency for additional information.
This document provides guidance to consultants who conduct archaeological investigations on National Forest System land in Utah. It identifies practices and expectations, both shared and variable, across the state. Representatives from the State Historic Preservation Office (SHPO), the Utah Public Lands Policy Coordinating Office, and the Utah Professional Archaeological Council reviewed a draft of this document and provided valuable edits and comments. We anticipate this first version will generate additional questions and comments that will require issuance of a revised version next year. Please send your feedback on the guide to the Regional Heritage Program Manager (see contact information below). The Forest Service administers land within six units of the National Forest System in Utah: the Ashley National Forest, the Dixie National Forest, the Fishlake National Forest, the Manti-La Sal National Forest, the Sawtooth National Forest, and the Uinta-Wasatch-Cache National Forests. They are part of the Forest Service's Intermountain Region (Region 4), which includes Nevada, part of eastern California, southern Idaho, southwest Wyoming, and a small area of Colorado Location and Description: This is a UWCNF project being completed in partnership with Watershed Restoration Initiative. The UWCNF is proposing to carry out large, landscape level vegetation treatments as part of the ongoing efforts to confront the wildfire crisis, protect communities, and improve resilience on the North Slope of the Uinta Mountains. This is the second phase of the Anadarko project, with archaeological surveys associated with phase I completed in 2023. The area of potential effect (APE) for this project will cover 4,662.45 acres. Deliverables will be in accordance with SHPO and Forest Service guidance and will include a cultural resource review and assessment of the entire APE along with archaeological survey documentation and related findings. By increasing fuels treatments over time, promoting community readiness, and supporting postfire recovery and restoration, the aim is to reduce the exposure of infrastructure and natural resources to uncharacteristic wildfires. The proposed vegetation treatments will mitigate wildfire risks on the North Slope of the Uinta Mountains. The goal is to create and maintain healthy, fire-adapted landscapes that minimize risks to communities both during and after wildfires. Period of Performance: This project is broken over two years with the following milestones and deadlines (please see Work Limits below): Year one fieldwork completed: 11/1/2024. Year one draft deliverables provided to UWCNF and DWR: 2/7/2025. Year one final deliverables provided to UWCNF and DWR: 3/14/2025. Year two fieldwork completed: 11/1/2025. Year two draft deliverables provided to UWCNF and DWR: 2/6/2026. Year two final deliverables provided to UWCNF and DWR: 3/13/2026. Site Visits: there will be NO Site Visit Question Submission Close Date 6/17/2024 2:00 PM MDT The method of Contractor Selection has not been Determined at this time.
Conceptual
Conference / Convention Centers
Public - State/Provincial
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 20, 2024
11925 N Horizon Dr, Highland, UT
Related To This Project
Highland, UT
Bid Date: Dec 11 2024
Highland, UT
Bid Date: May 29 2024
Highland, UT
Bid Date: May 09 2024
Highland, UT
Bid Date: Apr 18 2024
Highland, UT
Bid Date: Apr 01 2024
Highland, UT
Bid Date: Apr 02 2024
Highland, UT
Bid Date: Jan 09 2024
Highland, UT
Bid Date: Dec 07 2023
Highland, UT
--
Highland, UT
Bid Date: Mar 03 2022
Highland, UT
Bid Date: Mar 03 2022
Highland, UT
Bid Date: Mar 03 2022
Highland, UT
Bid Date: Mar 08 2022
Highland, UT
Bid Date: Mar 08 2022
Highland, UT
Bid Date: Oct 30 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.