BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Tacoma, Washington. Completed plans call for the renovation of a water / sewer project.

The City of Tacoma (City) / Department of Public Utilities (TPU) / Water Division (Tacoma Water) is soliciting bids to establish a contract for the re-roof of a 3.5 million gallon concrete reservoir. The Indian Hill Reservoir is located off Orcas Drive NE in Federal Way, Washington. The concrete roof of the reservoir's 3.5 million gallon belowground concrete tank is covered by a hot mop pea gravel coating installed in 1981. The hot mop pea gravel coating has exceeded its expected useful lifespan of 20 years and has deteriorated with multiple areas of no roof covering. Additionally, there are concerns that the hot mop pea gravel may leach metals or other compounds which could enter the tank via rainwater through cracks in the roof. The objective of this project is to analyze the existing hot mop pea gravel material and prepare a disposal plan for the material once removed; remove the existing roof coating in its entirety, repair any cracks or flaws identified in the reservoir roof once the coating has been removed; evaluate the existing reservoir vents based on reservoir flowrates and upgrade the vents, to meet AWWA standards; and to install a new high performance coating system on the roof. A Tamoseal/Tammscoat Base Coat/Finish Coat by Euclid Chemical Company coating system will be installed on the tank roof. This coating system was recently used by Tacoma Water as part of the successful Hood Street Reservoir Seismic Upgrades project. Also, initial evaluation of the tank indicates that current stormwater drainage patterns (i.e., sheet flow off the roof onto the surrounding ground) are adequate and drainage crickets are not necessary. Replacing the existing coating with a new high performance coating system will make these flow patterns more efficient and will decrease the potential for stormwater to pond on the reservoir roof. Overall, this project will repair any cracks in the reservoir roof, ensure the reservoir tank is sealed against and protected from rainwater intrusion, and bring the tank venting up to current standards. Estimate: $370,000.00 plus tax For electronic submittals, the City of Tacoma will designate the time of receipt recorded by our email, sendbid@cityoftacoma.org, as the official time of receipt. This clock will be used as the official time of receipt of all parts of electronic bid submittals. For in person submittals, the City of Tacoma will designate the time of receipt recorded by the timestamp located at the lobby security desk, as the official time of receipt. Late submittals will be returned unopened and rejected as non-responsive Requests for information regarding the specifications may be obtained by contacting Brandon Snow by email to bsnow@cityoftacoma.org. The City Council or Public Utility Board of the City of Tacoma shall be the final judge as to which is the lowest and best bid in the interest of the City of Tacoma. The City reserves the right to reject any and all bids, waive minor deviations or informalities, and if necessary, call for new bids. Each bid for construction must be accompanied either by a certified or cashier's check for 5 percent of the total amount bid, including tax, payable to the City Treasurer, or an approved bid bond, by a surety company authorized to do business in the State of Washington, for 5 percent of the total amount bid. The person legally authorized to sign the bid must sign all bid bonds. The approved bid bond form attached to these Specifications should be used: no substantial variations from the language thereof will be accepted. A performance and payment bond are both required for this project. Bonds will include a power of attorney, will be for 100% of the Contract total. The Contractor shall complete all work 60 calendar days from Notice to Proceed. If the Contractor fails to complete the work within the established time period, the City will assess liquidated damages at $1,000 per day in accordance with Section 3.14 of the General Provisions modified herein. Question Deadline 06/25/2024 (11:59pm) Questions and request for clarifications of the specifications may be submitted in writing to Brandon Snow by email to bsnow@cityoftacoma.org.

Post-Bid

Water / Sewer

$370,000.00

Public - City

Renovation

8

16

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
26
Bidding Soon
659
All Active Projects
281
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2024

August 7, 2024

img_map_placeholder

Orca Dr NE, Tacoma, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.