EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 14, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Urbana, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Proposal Nm CHP111951 County: Champaign DBE Goal: 7.00 Two Lane Resurfacing C/R/S: CHP-US 68-06.93 Completion Date: 10/15/2025 For Improving Various Sections in the City of Urbana, and Within Salem Township, of Champaign County, Ohio, in Accordance With Plans and Specifications by Performing Pavement Repairs and Resurfacing an Approximately 9 Mile Section of Us Route 68, From Gwynne St/washington Ave in the City of Urbana (Slm 6.93) to the Champaign/logan County Line (Slm 16.20), Including All Related Items of Work. OHDOT - Two Lane Resurfacing - US 68 The Department will indicate the work type required for each pay item. If the line item does not have a corresponding work type, NR will be shown in the work type column. This proposal note will govern the assignment of work types to pay items. However, the Contractor may perform incidental work items for which it does not hold the required work type provided the cost of the work does not exceed 5% of the total bid. The Contractor may also perform Work Type 26 (Structural steel painting) without holding the required work type provided the total area to be painted does not exceed 700 SF per structure. The Contractor may not perform any quantity of Work Type 55 or 56 unless they hold the required work type. The Contractor may perform Work Type 57 (Sealing of Concrete Surfaces with Epoxy or Non-Epoxy Sealers) without holding the required work type provided the total area to be sealed does not exceed 75 SY per project. Listed below are the work types for this proposal. In accordance with Ohio law, a bidder must possess work types, and perform work equal to the percentage included on the front cover of this proposal. This is a percentage of the total amount of the submitted bid price. The Director may, by insertion of a contract provision, reduce the fifty percent amount. This work consists of providing digital data for transfer for asphalt material weight ticket information. Provide material ticket information in a digital format directly recorded from the material loading source as described below. This note in no way supersedes any other commercial regulations or any other legal requirements regulating the transportation of commercial materials. This does not preclude or dismiss any requirement for paper tickets required by other rules and regulations. Requirements: Send digital ticket information to the Department's Digital Ticketing Portal as the individual material loads are generated and shipped to the Project. The digital material ticket shall contain information as required per the applicable material specification for weight measurement and other material characteristics. The Department will reject any load that does not have a corresponding e-Ticket unless the cause is beyond the Contractor's control, as determined by the Engineer. In such circumstances, paper tickets may be permitted. The surface tolerance specification requirements are modified to use the International Roughness Index (IRI) as follows for all pavements of constant width with at least 1 centerline mile (1.6 km) of continuous paving. Short breaks in paving such as bridge decks, intersections, etc. are not considered breaks in continuous paving. Also included is pavement for ramps, including acceleration lanes and deceleration lanes, where the total length is greater than 0.5 miles (0.8 km); and all interstateto-interstate ramps including acceleration lanes and deceleration lanes, regardless of total length. For roads with less than 1 centerline mile (1.6 km) of paving; ramps, acceleration lanes, and deceleration lanes not included above; and sections of undivided highways, as defined in this note, within corporation limits with posted speed limits less than 40 miles per hour, smoothness measurement and corrective action for all areas of localized roughness with an IRI in excess of 250 inches per mile (3.95 m/km) in 25 feet (7.6 m) is required. For these same areas, no corrective action for 0.1-mile (0.16 km) sections having an MRI (lot roughness) greater than 90 inches per mile (1.42 m/km) is required and no pay adjustments will be made. Do not include pavement for turn lanes including center turn lanes, shoulders, crossovers, approach slabs, and bridge decks in IRI measurements, corrective actions, and pay adjustments. Areas not part of this specification are subject to the requirements of the original item(s) specified. If the pavement surface is Rubberized Open Graded Asphalt Friction Course (Supplemental Specification 803), this specification applies to the surface of the course immediately below and references to the number of courses placed do not include the SS803 course.

GC Bidding

Roads / Highways

$3,010,517.00

Public - State/Provincial

Paving, Site Work

13

7

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
98
Bidding Soon
1,327
All Active Projects
569
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

April 28, 2025

img_map_placeholder

OH-68, Urbana, OH

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.