BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2024 at 8:00 PM

Updated August 27, 2024

Site work for a bridge / tunnel in Montrose, Colorado. Completed plans call for site work for a bridge / tunnel.

**As of July 31, 2024 project was awarded toK&D Construction, awarded amount is $241,302.90.** The City of Montrose owns a large-diameter culvert over Cedar Creek within the Cedar Cemetery on Miami Road. The crossing is a 9.5 foot diameter corrugated metal pipe structure with cast in place headwalls that has experienced structural pipe failure and displacement. As a result, the culvert crossing is currently out of service to vehicular use. The bridge provides pedestrian and equipment access to the northern potions of the cemetery. This project aims to replace the failed culvert while preserving the existing headwall structures at each end of the crossing. The project consists of furnishing all labor, equipment, and materials necessary to complete the Cedar Cemetery Culvert Replacement Project in accordance with the project plans and specifications. This includes, but is not limited to, the following key tasks: A. Perform removals to clear the site for construction including, but not limited to, asphalt pavement, the existing culvert, and rip-rap/rubble at each headwall. B. Replace the culvert crossing by reforming the annulus in each headwall, re-grouting, installing flowable fill pipe cradles at each headwall, and installing steel struts between the headwalls to help stabilize. C. Replace rip-rap at the upstream and downstream ends of the culvert. D. Reconstruct the roadway base and pave with hot mix asphalt. E. Implement stormwater management, traffic control, water management/stream bypass, site security, site restoration, and quality control testing as required to complete the work in accordance with the plans and specifications. The deadline for receipt of questions from Bidders in regards to this IFB is 12:00 Noon on June 27, 2024. All questions regarding this Request for Proposal shall be directed to contact is Scott Murphy at (970) 901-1792 or email: smurphy@cityofmontrose.org .

Award

Bridges / Tunnels

$241,302.00

Public - City

Site Work

8

3

2

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
25
Bidding Soon
193
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.