Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a bridge / tunnel in Montrose, Colorado. Completed plans call for site work for a bridge / tunnel.
**As of July 31, 2024 project was awarded toK&D Construction, awarded amount is $241,302.90.** The City of Montrose owns a large-diameter culvert over Cedar Creek within the Cedar Cemetery on Miami Road. The crossing is a 9.5 foot diameter corrugated metal pipe structure with cast in place headwalls that has experienced structural pipe failure and displacement. As a result, the culvert crossing is currently out of service to vehicular use. The bridge provides pedestrian and equipment access to the northern potions of the cemetery. This project aims to replace the failed culvert while preserving the existing headwall structures at each end of the crossing. The project consists of furnishing all labor, equipment, and materials necessary to complete the Cedar Cemetery Culvert Replacement Project in accordance with the project plans and specifications. This includes, but is not limited to, the following key tasks: A. Perform removals to clear the site for construction including, but not limited to, asphalt pavement, the existing culvert, and rip-rap/rubble at each headwall. B. Replace the culvert crossing by reforming the annulus in each headwall, re-grouting, installing flowable fill pipe cradles at each headwall, and installing steel struts between the headwalls to help stabilize. C. Replace rip-rap at the upstream and downstream ends of the culvert. D. Reconstruct the roadway base and pave with hot mix asphalt. E. Implement stormwater management, traffic control, water management/stream bypass, site security, site restoration, and quality control testing as required to complete the work in accordance with the plans and specifications. The deadline for receipt of questions from Bidders in regards to this IFB is 12:00 Noon on June 27, 2024. All questions regarding this Request for Proposal shall be directed to contact is Scott Murphy at (970) 901-1792 or email: smurphy@cityofmontrose.org .
Award
Bridges / Tunnels
$241,302.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2024
August 1, 2024
To Be Determined, Montrose, CO
Related To This Project
Montrose, CO
Bid Date: Jul 03 2024
Montrose, CO
Bid Date: Jul 03 2024
Montrose, CO
Bid Date: Jul 12 2024
Montrose, CO
--
Montrose, CO
--
Montrose, CO
Bid Date: Jul 22 2024
Montrose, CO
Bid Date: Jul 31 2024
Montrose, CO
Bid Date: Jul 26 2024
Montrose, CO
--
Montrose, CO
--
Montrose, CO
Bid Date: Jun 03 2024
Montrose, CO
Bid Date: May 31 2024
Montrose, CO
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.