Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a military facility in Wright Patterson AFB, Ohio. Conceptual plans call for the construction of a military facility; and for site work for a military facility.
AMDT 0001*************************************************************** SYNOPSIS: This announcement is open to all businesses regardless of size. The proposed services, which will be obtained by a negotiated Firm Fixed Price Contract, is for Full Design Architect/Engineer Services Contract for the construction of the Acquisition Management Complex Phase V (AMC-V) located at the Wright-Patterson Air Force Base, Ohio. This design contract will be for the AMC-V, associated facilities and site work. The contract duration is up to 60 months, including Title II Services. The estimated construction cost for the project is between $100,000,000 and $250,000,000. PROJECT SPECIFIC INFORMATION: The Design Acquisition Management Complex Phase V (AMC-V) project will construct a new 214,201 S.F. facility utilizing economical design and construction methods. The building will be the latest phase of the AMC Complex and shall be joined to the existing AMC buildings through the three-level precast concrete connecting arcade and tunnel. The building will consist of one level below grade and four-levels built above grade. The most recently constructed facility in the complex, AMC-IV (F/20553) will be used as a model for the massing, basic layout, exterior finishes, and architectural details. The exterior finishes will be required to match the existing AMC buildings, consisting of precast concrete wall panels, aluminum curtain wall systems, and accented entries with standing seam metal roofs. The program will primarily be secure administrative space and the required support spaces (restrooms, conference rooms, auditorium, etc.). There will be multiple customer groups involved, whose requirements will need to be determined and incorporated into the final design. While the basic site for the new building has been determined, a new site design will be required that includes sidewalk layout, revised parking layout, repairing the storm water drainage in addition to resurfacing of the parking lot will be included in the project. Stormwater shall be managed through storm drainage inlets and piping as sheet drainage cannot be accommodated. Utilities will need to be connected to the existing infrastructure. The AMC complex has a central utilities distribution plant denoted as CUSDC. Heat shall be provided by a new electric boiler to be located in the CUSDC Building with heating water piping extended through the tunnel. Sanitary service is provided through a lift station north of AMC-IV. Electrical power shall be extended from the CUSDC Building through feeders run through the service tunnel and AMC-V shall have a unit substation to provide the required building voltage. Telecommunications shall be served through a cable vault in the CUSDC Building. Separate plans for the demolition of three facilities will be developed as part of this effort. All three facilities will be demolished, graded, and seeded. F/20039 (18,982 SF) and F/20091 (3,918 SF) are stand-alone facilities. F/20016 (295,933 SF) will be a complex demolition effort. The facility shares walls with two existing facilities that are to remain and three pedestrian connectors to other facilities. The facilities removal will create additional different base systems that will create wider impact beyond just immediately adjacent facilities and will need to be addressed. Facilities will be designed as permanent construction in accordance with the DoD Unified Facilities Criteria (UFC) 1-200-01: General Building requirements, all other UFCs as applicable, Air Force Corporate Facilities Standards (AFCFS) and the Wright-Patterson AFB Installation Facilities Standards (IFS). This project will comply with DoD Antiterrorism/Force Protection requirements per UFC 4-010-01 and Intelligence Community Directive 705 (ICD 705). A comprehensive interior design will need to be completed, to include both the structural interior design and a furniture, fixtures & equipment (FF&E) design package to be completed. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Military
$250,000,000.00
Public - Federal
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 11, 2025
To Be Determined, Wright Patterson AFB, OH
Related To This Project
Wright Patterson AFB, OH
Bid Date: Jul 03 2024
Wright Patterson AFB, OH
--
Wright Patterson AFB, OH
Bid Date: Sep 18 2024
Wright Patterson AFB, OH
Bid Date: Sep 13 2024
Wright Patterson AFB, OH
--
Wright Patterson AFB, OH
Bid Date: Nov 15 2024
Repair HVAC AHU's 1,2,4 & 5 and Chillers 88 CG Building 10271 at Wright- Patterson AFB. OH - 5422990
Wright Patterson AFB, OH
Bid Date: Sep 17 2024
Wright Patterson AFB, OH
--
Wright Patterson AFB, OH
Bid Date: Apr 02 2024
Wright Patterson AFB, OH
Bid Date: Feb 23 2024
Wright Patterson AFB, OH
Bid Date: Jun 27 2024
Wright Patterson AFB, OH
Bid Date: Jan 11 2024
Wright Patterson AFB, OH
Bid Date: Apr 03 2024
Wright Patterson AFB, OH
Bid Date: Nov 14 2023
Wright Patterson AFB, OH
Bid Date: Nov 02 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.