BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Winthrop, Maine. Completed plans call for the renovation of a water / sewer project.

The Project includes Replacement of the Mechanic Street Pump Station, renewal of 4 wet well/dry pit pump stations along Memorial Drive, and renewal of 3 submersible pump stations. Owner anticipates that the Project's total bid price will be approximately $[2,000,000]. The Project has an expected duration of 280 days, once materials and equipment are obtained and Contact time commences. Prospective Bidders may obtain or examine the Bidding Documents at the Issuing Office on Monday through Friday between the hours of 9:00 am and 4:00 pm. Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including addenda, if any, obtained from sources other than the Issuing Office. Bidding Documents in various formats as described below may be purchased for the fees listed. A certified check or bank draft payable to the OWNER or a satisfactory Bid Bond executed by the Bidder and a Surety Company in the amount equal to five percent (5%) of the Bid shall be submitted with each bid. No bid may be withdrawn for at least 60 days after receipt of bids unless released by the Owner. If bid amount is $125,00.00 or greater then Bid shall be accompanied by a bid security in the amount of 5% of the Total Bid Price as outlined in the Instructions to Bidders. If bid amount is $125,000.00 or greater, Payment and Performance Bonds will need to be provided at Contract Signing as described in the Contract Documents. The Owner reserves the right to waive any informalities or to reject any or all bids. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. Question Deadline 07/02/2024 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Timothy Sawtelle, P.E., Principal Engineering at tim@dirigoeng.com B. James Lord, P.E., Project Manager at jlord@dirigoengineering.com Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Award

Water / Sewer

$3,579,000.00

Public - City

Renovation

17

23

19

7

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
12
Bidding Soon
341
All Active Projects
98
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

September 25, 2024

img_map_placeholder

To Be Determined, Winthrop, ME

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.