Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Frankfort, Illinois. Completed plans call for site work for a water / sewer project.
Tank Information: The structure is a 3,000,000-gallon standpipe water storage tank with a diameter of 75 ft. and a high-water level of 96 ft. 9 in. located at 8847 W. Lincoln Hwy. in Frankfort, Illinois. The work includes: Exterior: Abrasive blast clean to a SSPC-SP6 commercial standard within containment. Apply a four (4) coat zinc epoxy urethane system. Wet Interior: Abrasive blast clean to a SSPC-SP10 near-white metal standard. Apply a three (3) coat zinc epoxy system. Foundation: Abrasive blast clean and apply a two (2) coat epoxy system. Cathodic Protection: Install an impressed current cathodic protection system. Mixer: Install an air powered mixer. Repairs: 1) Replace the sidewall manway gaskets. 2) Install a gasket on the wet interior roof hatches. 3) Install deflector bars on the fill pipe and draw pipe. 4) Overflow discharge modification. 5) Replace the roof vent. MISCELLANEOUS A. Due to supply chain issues, the Owner reserves the right to require the Contractor to have all of the required coating for the project delivered to the site or to the Owner's storage facility prior to the tank being taken out-of-service and prior to the commencement of the project. Liquidated damages are applicable and begin after 90 days out-of-service or after Substantial Completion date whichever is the earlier date. Liquidated damages at $1,250/calendar day is to apply after this date. Ready for Final Payment Date is to be thirty (30) days after date Substantial Completion Date based on out-of-service days or scheduled Substantial Completion, or as adjusted by Change Order, or actual Substantial Completion if earlier. Liquidated damages after Ready for Final Payment Date of $250/day is to apply. Liquidated damages are cumulative if damages from Substantial Completion and Ready for Final Payment overlap. In addition, Special Damages, fines, or Set-Off may also apply per Bid/Agreement Form. Contractors will be prequalified for different sized tanks and towers based on experience, workmanship, successful Project completions with DIXON and Contractor's financial data. Prequalification protocol is in the Instructions to Bidders. Any Contractor who has any projects in dispute or unfinished because of Contract problems will be considered NOT prequalified. Disqualification will result in the return of any handling fee for Bidding Documents. Commence work on or after September 1, 2024. Substantial Completion by November 29, 2024, including cure and disinfection time. The Contractor will be allowed to mobilize, rig the tank, and perform some repairs while the tank is in service before September 1 st . Document Note: There will be no refund of handling charge for return of specification packages, or in the digital format. Format Cost Bidding Requirements $200.00 Electronic download of Bidding Requirements by email (PDF) $100.00
Post-Bid
Water / Sewer
$740,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 18, 2024
September 1, 2024
8847 W Lincoln Hwy, Frankfort, IL
Related To This Project
Frankfort, IL
--
Frankfort, IL
Bid Date: Jul 24 2024
Frankfort, IL
Bid Date: Jul 18 2024
Frankfort, IL
Bid Date: Jul 25 2024
Frankfort, IL
Bid Date: Jul 25 2024
Frankfort, IL
Bid Date: Aug 05 2024
Frankfort, IL
Bid Date: Aug 05 2024
Frankfort, IL
Bid Date: Sep 11 2024
Frankfort, IL
Bid Date: Jun 25 2024
Frankfort, IL
--
Frankfort, IL
Bid Date: Jun 14 2024
Frankfort, IL
Bid Date: Jun 14 2024
Frankfort, IL
Bid Date: May 07 2024
Frankfort, IL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.