Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a sidewalk / parking lot in Indianapolis, Indiana. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Qualified contractors for project provides for the improvement of 50 bus stops on the near east side of Indianapolis. The work at each location includes, but is not limited to, concrete boarding pads for benches and shelters, sidewalk, curbs, curb ramps, seeding, and minor asphalt resurfacing. Written Questions Due: 6/27/2024 by 3:00pm EST Answers Provided and Posted: 7/1/2024. SCOPE OF WORK 2.1 Contractor shall assume and fulfill all obligations and perform all Work required to construct, complete, and make ready the Project for use by the Owner. Contractor agrees to perform and complete such Work in strict accordance with the Contract Documents and in accordance with all applicable laws, rules, regulations and standards applicable to such Work. 2.2 Contractor is responsible for the overall coordination of the Work and for insuring that the Work is accomplished as an integrated whole, with no items necessary to make it so excluded from the Work. Any portion of the Work necessary to accomplish integration shall be undertaken by Contractor as part of the Contract Price. 2.3 The Work shall conform with the quality levels established by the Contract Documents. What is or has been usual or customary in a given trade or on other projects shall not limit, qualify or reduce the standards of quality, fitness and/or performance of products and workmanship established by or inferable from the Contract Documents. 2.4 Contractor shall provide all labor, materials, tools, equipment and supervision incidental to or necessary for the proper and efficient execution and completion of the Work as it relates to the Project, and shall promptly pay for all material purchased, equipment leased and labor utilized or employed, including base wages and fringe benefits, and, if requested by Owner, obtain and furnish Owner weekly with payroll verified by affidavit. 2.5 Contractor shall maintain adequate, experienced and cooperative supervisory personnel acceptable and satisfactory to Owner at the Project site at all times. If requested by Owner, Contractor shall provide a full-time, on-site project manager or superintendent for the Project who shall be duly authorized to act for and on behalf of Contractor in all matters pertaining to the Project and said project manager or superintendent shall attend all jobsite meetings regarding the Project. 2.6 Contractor shall submit shop drawings, product data, samples and similar submittals required by the Contract Documents with reasonable promptness and in such sequence as to cause no delay in the Work or in the activities of other contractors or subcontractors. 2.7 If Contractor shall make changes in design, including dimensional changes, either through shop drawings or actual field work, it shall accept the responsibility for the structural and functional adequacy of such changes and their acceptance by Owner, Owners Construction Engineer or Designer of Record. Any structural or functional inadequacies which may develop because of such changes shall be remedied by Contractor unless such change is specifically included in a change order provided for in Article 5.
Post-Bid
Sidewalks / Parking Lot
$325,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
12
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 11, 2024
August 12, 2024
Multiple Locations, Indianapolis, IN
Related To This Project
Indianapolis, IN
Bid Date: Jul 12 2024
Indianapolis, IN
--
Indianapolis, IN
--
Indianapolis, IN
Bid Date: Jul 10 2024
Indianapolis, IN
Bid Date: Jul 12 2024
Indianapolis, IN
--
Indianapolis, IN
--
Indianapolis, IN
Bid Date: Jul 18 2024
Indianapolis, IN
Bid Date: Jul 17 2024
Indianapolis, IN
Bid Date: Jul 02 2024
Indianapolis, IN
Bid Date: Jun 28 2024
Indianapolis, IN
Bid Date: Jun 27 2024
Indianapolis, IN
Bid Date: Aug 15 2024
Indianapolis, IN
Bid Date: Jul 02 2024
Indianapolis, IN
Bid Date: Jul 09 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.