BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Indianapolis, Indiana. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Qualified contractors for project provides for the improvement of 50 bus stops on the near east side of Indianapolis. The work at each location includes, but is not limited to, concrete boarding pads for benches and shelters, sidewalk, curbs, curb ramps, seeding, and minor asphalt resurfacing. Written Questions Due: 6/27/2024 by 3:00pm EST Answers Provided and Posted: 7/1/2024. SCOPE OF WORK 2.1 Contractor shall assume and fulfill all obligations and perform all Work required to construct, complete, and make ready the Project for use by the Owner. Contractor agrees to perform and complete such Work in strict accordance with the Contract Documents and in accordance with all applicable laws, rules, regulations and standards applicable to such Work. 2.2 Contractor is responsible for the overall coordination of the Work and for insuring that the Work is accomplished as an integrated whole, with no items necessary to make it so excluded from the Work. Any portion of the Work necessary to accomplish integration shall be undertaken by Contractor as part of the Contract Price. 2.3 The Work shall conform with the quality levels established by the Contract Documents. What is or has been usual or customary in a given trade or on other projects shall not limit, qualify or reduce the standards of quality, fitness and/or performance of products and workmanship established by or inferable from the Contract Documents. 2.4 Contractor shall provide all labor, materials, tools, equipment and supervision incidental to or necessary for the proper and efficient execution and completion of the Work as it relates to the Project, and shall promptly pay for all material purchased, equipment leased and labor utilized or employed, including base wages and fringe benefits, and, if requested by Owner, obtain and furnish Owner weekly with payroll verified by affidavit. 2.5 Contractor shall maintain adequate, experienced and cooperative supervisory personnel acceptable and satisfactory to Owner at the Project site at all times. If requested by Owner, Contractor shall provide a full-time, on-site project manager or superintendent for the Project who shall be duly authorized to act for and on behalf of Contractor in all matters pertaining to the Project and said project manager or superintendent shall attend all jobsite meetings regarding the Project. 2.6 Contractor shall submit shop drawings, product data, samples and similar submittals required by the Contract Documents with reasonable promptness and in such sequence as to cause no delay in the Work or in the activities of other contractors or subcontractors. 2.7 If Contractor shall make changes in design, including dimensional changes, either through shop drawings or actual field work, it shall accept the responsibility for the structural and functional adequacy of such changes and their acceptance by Owner, Owners Construction Engineer or Designer of Record. Any structural or functional inadequacies which may develop because of such changes shall be remedied by Contractor unless such change is specifically included in a change order provided for in Article 5.

Post-Bid

Sidewalks / Parking Lot

$325,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

12

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
32
Bidding Soon
745
All Active Projects
385
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

August 12, 2024

img_map_placeholder

Multiple Locations, Indianapolis, IN

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.