BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Georgetown, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of September 11, 2024 this project has not yet been awarded. A timeline for award has not yet been established.** The deadline to ask questions is 7/30/2024 12:00 PM CST The Project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: o3,800 feet of Force Main by Open Cut o750 feet of Force Main by Directional Bore o323 feet of 36" Steel Encasement by Bore oConnect Forcemain to San Gabriel Lift Station / Headworks oConstruct Access Drive oRemove and Replace Fencing oRemove and Replace Paved Road and Parking Lot and ground cover/trees as necessary Description This Item shall govern approved methods and materials for the coating and rehabilitation of deteriorated brick and concrete structures by spray-application of a monolithic 100% solids,rigid, ultra high-build, polyurethane lining system in combination with a high strength, fiber reinforced cementitous liner to eliminate infiltration, provide corrosion protection, repair voids and enhance structural integrity. These structures include, but are not limited to manholes, junction boxes, wet wells, lift stations and pump stations. Condition 3 is approved for the Alternative Method, while Conditions 1 and 2 will be applicable to the Bid Item Coat Entire Manhole PID- 2023-130 Summary of Work: o Connect to Existing Lift Station Discharge Piping (remove spool and install tee/filler if necessary and valve). Shutdown will be coordinated with City Staff. o 20" DIP Force Main by Open Cut o 20" HDPE Force Main by directional drill (under San Gabriel River and N. College St.) o 20" Force Main by conventional bore (under Solid Waste parking facility) o Connect to Existing piping near Headworks Facility in WWTP. o Applicable surface restoration. o Drive area must remain open to allow access to parking facilities to the east of the directional drill start point. o Any trees or other surface features damaged or removed during the installation of the directional drill shall be replaced with similar or better. Engineer, City Staff and Contractor shall meet on site and document any items that are to be removed or that have been damaged. o Contractor shall supply an updated schedule with each monthly pay application, noting key milestones.

Bid Results

Water / Sewer

$2,132,338.00

Public - City

Paving, Site Work

30

21

43

8

Subscribe For Documents

107 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
33
Bidding Soon
2,051
All Active Projects
760
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

September 30, 2024

img_map_placeholder

Multiple Locations, Georgetown, TX

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.