BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Austin, Texas. Completed plans call for site work for a power facility.

Estimated Amount for Solicitation: $14,000,000.00 Decker Dam requires gate replacements and trunnion anchorage improvements. The Work consists of the fabrication and installation of two (2) new spillway tainter (radial) gates as well as the removal and disposal of the existing spillway gates. Additional items include: fabrication and installation of new spillway tainter gate hoists, installation of new post-tensioning anchors and high-strength concrete panels, concrete slab repair, and stoplog seal replacement. The lake level will be lowered in March 2024 to reduce load on the gates and trunnion anchorage until this construction scope is completed. Dam experts have advised that this interim risk reduction measure will extend the life of the currently installed equipment by an additional 3-5 years. All Proposals shall be accompanied by an acceptable Bid guaranty in an amount of not less than five percent (5%) of the total Proposal. Performance and payment bonds when required shall be executed on forms furnished by OWNER. Each bond shall be issued in an amount of one hundred percent (100%) of the Contract Amount by a solvent corporate surety company authorized to do business in the State of Texas and shall meet any other requirements established by law or by OWNER pursuant to applicable law. Minimum insurance requirements are specified in Section 00810, Supplemental General Conditions. Minimum wage rates have been established and are specified in Section 00830, Wage Rates and Payroll Reporting. Contract Time is of the essence and all Work shall be substantially completed within six hundred and seventy (670) Calendar Days after date specified in the Notice to Proceed, in accordance with the Proposal Form, Section 00300CSP. If a Substantial Completion date has been specified, the Proposer further agrees to reach Final Completion within thirty (30) Calendar Days after Substantial Completion as required by the Project Manual, Drawings and Addenda for the work. Liquidated damages are one thousand three hundred seventy dollars ($1,370) per Calendar Day for failure to substantially complete the work and five hundred thirty dollars ($530) per Calendar Day for failure to achieve final completion within Thirty (30) Calendar Days after substantial completion, in accordance with the Proposal Form, Section 00300CSP. OWNER reserves the right to reject any or all Proposals and to waive any minor informality in any Proposal or solicitation procedure (a minor informality is one that does not affect the competitiveness of the Proposal).

Post-Bid

Power Plant

$14,000,000.00

Public - City

Site Work

45

16

23

2

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
290
Active Projects
153
Bidding Soon
3,749
All Active Projects
1,407
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 22, 2024

October 21, 2024

September 21, 2026

img_map_placeholder

6620 Blue Bluff Rd, Austin, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.