BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Green Bay, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Traffic Signal Repair 2024. City of Green Bay Standard Specifications and Construction Standards for Public Works Construction, 2024 Edition, and the Special Provisions of This Contract, All of Which Are on File in the City Clerk's/treasurer's Office and the Director of Public Works Office in the Green Bay City Hall. The Work Shall Be Let in Accordance With the Following Sections of the Wisconsin Statutes. 1. Section 62.15 Regarding Public Works Construction. 2. Section 779.15 Regarding Lien on Contractors. 3. Section 66.0901(2) Regarding Proof of Responsibility. All Bidders Shall Provide Proof of Responsibility on the Form Furnished by the Director of Public Works and It Shall Be Filed With the Director of Public Works Not Less Than Five (5) Days Prior to the Time Set for Opening of Bids. Bid Service Provided for That Purpose and Issued to the Specific Bidder by the Director of Public Works Together a Bid Bond Equal to at Least Five (5) but Not More Than Ten (10) Percent of the Bid Payable to the City of Green Bay as a Guarantee That if His/her Bid is Accepted, He/she Will Execute and File the Contract and a Performance Bond in the Amount of One Hundred Percent (100%) of the Total Bid Within Ten (10) Days After the Award of the Contract. Only the Proposal Pages. Bid Bond. Affidavit of Compliance. Includes 1280 linear feet of PVC conduit, removal of 19 concrete base foundations, construction of 24 concrete signal foundations, removal and construction of 8 owner supplied pull boxes, concrete curb and gutter, sidewalk, pavement, and associated site restoration. The Work Under This Contract Includes 1280 Linear Feet of Pvc Conduit, Removal of 19 Concrete Base Foundations, Construction of 24 Concrete Signal Foundations, Removal and Construction of 8 Owner Supplied Pull Boxes, Concrete Curb and Gutter, Sidewalk, Pavement, and Associated Site Restoration. Work under this Contract includes construction of PVC conduits and wiring, removal and construction of concrete signal foundations, construction of City supplied pull boxes, concrete curb and gutter, sidewalk, pavement and other site restoration. The work is distributed among locations shown on the plan. Total quantities and number of locations could change by the end of the contract period depending on the needs of the City of Green Bay. This Prohibition Applies With Like Force to Officers of Convicted Corporations, Firms, or Individuals Who Thereafter Have Business Interest in New Corporations or Business Enterprises of Whatever Kind or Description. The City of Green Bay, Wisconsin Reserves the Right to Reject Any or All Bids and to Waive Any Informality in Bidding. No Bids Shall Be Withdrawn After the Opening of Bids Without the Consent of the City of Green Bay, Wisconsin for a Period of Sixty (60) Days After the Scheduled Time for Closing Bids. Question Deadline 06/28/2024 All questions about the meanings or intent of the Contract Documents shall be submitted to the Engineer in writing. In order to guarantee a response, questions shall be submitted no later than four (4) calendar days prior to the bid opening date. Completion- October 27, 2024.

Bid Results

Sidewalks / Parking Lot

$314,655.00

Public - City

Paving, Site Work

14

4

5

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
17
Bidding Soon
263
All Active Projects
105
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2024

August 1, 2024

img_map_placeholder

Multiple Locations, Green Bay, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.