Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Green Bay, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
Traffic Signal Repair 2024. City of Green Bay Standard Specifications and Construction Standards for Public Works Construction, 2024 Edition, and the Special Provisions of This Contract, All of Which Are on File in the City Clerk's/treasurer's Office and the Director of Public Works Office in the Green Bay City Hall. The Work Shall Be Let in Accordance With the Following Sections of the Wisconsin Statutes. 1. Section 62.15 Regarding Public Works Construction. 2. Section 779.15 Regarding Lien on Contractors. 3. Section 66.0901(2) Regarding Proof of Responsibility. All Bidders Shall Provide Proof of Responsibility on the Form Furnished by the Director of Public Works and It Shall Be Filed With the Director of Public Works Not Less Than Five (5) Days Prior to the Time Set for Opening of Bids. Bid Service Provided for That Purpose and Issued to the Specific Bidder by the Director of Public Works Together a Bid Bond Equal to at Least Five (5) but Not More Than Ten (10) Percent of the Bid Payable to the City of Green Bay as a Guarantee That if His/her Bid is Accepted, He/she Will Execute and File the Contract and a Performance Bond in the Amount of One Hundred Percent (100%) of the Total Bid Within Ten (10) Days After the Award of the Contract. Only the Proposal Pages. Bid Bond. Affidavit of Compliance. Includes 1280 linear feet of PVC conduit, removal of 19 concrete base foundations, construction of 24 concrete signal foundations, removal and construction of 8 owner supplied pull boxes, concrete curb and gutter, sidewalk, pavement, and associated site restoration. The Work Under This Contract Includes 1280 Linear Feet of Pvc Conduit, Removal of 19 Concrete Base Foundations, Construction of 24 Concrete Signal Foundations, Removal and Construction of 8 Owner Supplied Pull Boxes, Concrete Curb and Gutter, Sidewalk, Pavement, and Associated Site Restoration. Work under this Contract includes construction of PVC conduits and wiring, removal and construction of concrete signal foundations, construction of City supplied pull boxes, concrete curb and gutter, sidewalk, pavement and other site restoration. The work is distributed among locations shown on the plan. Total quantities and number of locations could change by the end of the contract period depending on the needs of the City of Green Bay. This Prohibition Applies With Like Force to Officers of Convicted Corporations, Firms, or Individuals Who Thereafter Have Business Interest in New Corporations or Business Enterprises of Whatever Kind or Description. The City of Green Bay, Wisconsin Reserves the Right to Reject Any or All Bids and to Waive Any Informality in Bidding. No Bids Shall Be Withdrawn After the Opening of Bids Without the Consent of the City of Green Bay, Wisconsin for a Period of Sixty (60) Days After the Scheduled Time for Closing Bids. Question Deadline 06/28/2024 All questions about the meanings or intent of the Contract Documents shall be submitted to the Engineer in writing. In order to guarantee a response, questions shall be submitted no later than four (4) calendar days prior to the bid opening date. Completion- October 27, 2024.
Bid Results
Sidewalks / Parking Lot
$314,655.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2024
August 1, 2024
Multiple Locations, Green Bay, WI
Related To This Project
Green Bay, WI
Bid Date: Jul 02 2024
Green Bay, WI
Bid Date: Jul 01 2024
Green Bay, WI
--
Green Bay, WI
--
Green Bay, WI
Bid Date: Jul 08 2024
Green Bay, WI
Bid Date: Jul 08 2024
Green Bay, WI
Bid Date: Jul 15 2024
Green Bay, WI
Bid Date: Jul 15 2024
Green Bay, WI
Bid Date: Jul 02 2024
Green Bay, WI
Bid Date: Jun 25 2024
Green Bay, WI
Bid Date: Jun 25 2024
Green Bay, WI
--
Green Bay, WI
Bid Date: Jun 18 2024
Green Bay, WI
Bid Date: Jun 18 2024
Green Bay, WI
Bid Date: Jul 02 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.