BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 15, 2025 at 8:00 PM

Updated April 16, 2025

Renovation of a clubhouse / community center in Columbia, Missouri. Completed plans call for the renovation of a clubhouse / community center.

Location: Blind Boone Community Center, 301 N. Providence Road, Columbia, MO 65203 Each bidder must submit with his/her bid a satisfactory Bid Bond, a certified check, or a bank draft payable to the Columbia Housing Authority in the amount of (5%) of the total bid amount. Employee payments shall meet minimum salary and wage rates as set forth in the Project Manual. The Contractor must ensure that employees and applicants for employment are not discriminated against because of race, creed, color, sex or national origin. Attention is called to the provisions for equal employment opportunity for businesses and low income persons as provided in Section 3 of the Housing & Urban Development's Act of 1968. All bidders are expected to examine the specifications, all instructions, and the construction sites. Failure to do so will be at the bidder's risk. The Columbia Housing Authority is an equal opportunity employer WORK INCLUDES: Outdoor drainage, regrading of playground and minor kitchen renovations. Scope of Work NOTE: Bidders must Verify all Measurements and Quantities listed above to insure proper bidding. The contractor is responsible for all applicable professional services including but not limited to Engineering, architectural and permitting. 1. Install retaining wall along the North/South Sidewalk just West of the building. 2. Raise Exterior finish grade within 10" of existing playground elevation where retaining wall is installed. Place 3" of playground chips onto fill. 3. Maintain drainage swell to route water from playground area to the North onto Boone Drive. 4. Remove/replace Kitchen Cabinets where applicable. 5. Replace kitchen door with new sliding door. 6. Patch and paint kitchen walls and ceilings. 7. Route 4 dedicated 20 AMP electrical outlets to the kitchen. 8. Replace ceiling light fixtures with new LED fixtures. 9. Install new 3 bay commercial sink and faucet.

Award

Clubhouse / Community Centers

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
48
Bidding Soon
427
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2024

August 14, 2024

Project location map

301 N Providence Rd, Columbia, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.