BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Parkersburg, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

Work under this project consists of approximately 1,800 feet of 12-inch through 48-inch storm sewer; approximately 16 storm intakes; approximately 4 storm manholes; approximately 600 feet of 8-inch watermain with fittings; approximately 1,600 feet of 4-inch subdrain; approximately 5,500 square yards of PCC or ACC street pavement; approximately 1,400 square yards of PCC trail pavement; approximately 9,000 cubic yards earthwork; phased work; removals; seeding; along with appurtenant work. This work is shown in detail on the construction plans on file with the City Clerk. Funding for the project is by cash on hand from the City's budget, and possibly revenue bonds as may be required. There are no State or Federal monies or grant funds involved. There are no MBE, WBE or SBE requirements. Davis-Bacon provisions do not apply. Liquidated damages in the amount of $1,000.00 per calendar day will be assessed for each day that work remains uncompleted after the deadline set below. Contractor shall begin work within ten days of the Owner's Notice to Proceed, and work shall proceed continuously until completed. Work must be completed by October 31st, 2025. The city reserves the right to reject any and all bids, to waive informalities and technicalities. The Council reserves the right to defer acceptance of any proposal for a period not to exceed sixty (60) calendar days after the date bids are to be received. If awarded, one (1) contract will be awarded to the lowest responsible, responsive bidder for Base Bid with alternates or deductions based on the amount of work, type of materials selected by the City based, and lifecycle costs. There are no State or Federal monies or grant funds involved. There are no MBE, WBE or SBE requirements. Davis-Bacon provisions do not apply. Question Deadline 07/05/2024 Questions received less than five days prior to the date of opening of Bids will not be answered, submitted to Engineer in writing. Mr. Lee Gallentine, P.E. lgallentine@cgaconsultants.com

Bid Results

Water / Sewer

$1,224,556.00

Public - City

Paving, Site Work

54

7

34

4

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
47
Bidding Soon
632
All Active Projects
228
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2024

September 9, 2024

img_map_placeholder

Newell Ave, Parkersburg, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.