Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 12, 2024 at 8:00 PM

Updated August 21, 2024

Site work and paving for a mixed-use development in Parkersburg, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.

Work under this project consists of approximately 1,800 feet of 12-inch through 48-inch storm sewer; approximately 16 storm intakes; approximately 4 storm manholes; approximately 600 feet of 8-inch watermain with fittings; approximately 1,600 feet of 4-inch subdrain; approximately 5,500 square yards of PCC or ACC street pavement; approximately 1,400 square yards of PCC trail pavement; approximately 9,000 cubic yards earthwork; phased work; removals; seeding; along with appurtenant work. This work is shown in detail on the construction plans on file with the City Clerk. Funding for the project is by cash on hand from the City's budget, and possibly revenue bonds as may be required. There are no State or Federal monies or grant funds involved. There are no MBE, WBE or SBE requirements. Davis-Bacon provisions do not apply. Liquidated damages in the amount of $1,000.00 per calendar day will be assessed for each day that work remains uncompleted after the deadline set below. Contractor shall begin work within ten days of the Owner's Notice to Proceed, and work shall proceed continuously until completed. Work must be completed by October 31st, 2025. The city reserves the right to reject any and all bids, to waive informalities and technicalities. The Council reserves the right to defer acceptance of any proposal for a period not to exceed sixty (60) calendar days after the date bids are to be received. If awarded, one (1) contract will be awarded to the lowest responsible, responsive bidder for Base Bid with alternates or deductions based on the amount of work, type of materials selected by the City based, and lifecycle costs. There are no State or Federal monies or grant funds involved. There are no MBE, WBE or SBE requirements. Davis-Bacon provisions do not apply. Question Deadline 07/05/2024 Questions received less than five days prior to the date of opening of Bids will not be answered, submitted to Engineer in writing. Mr. Lee Gallentine, P.E. lgallentine@cgaconsultants.com

Bid Results

Water / Sewer

$1,224,556.00

Public - City

Paving, Site Work

54

7

34

4

Subscribe For Documents

61 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
65
Bidding Soon
968
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2024

September 9, 2024

Project location map

Newell Ave, Parkersburg, IA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed