Site work for a municipal facility in Cantonment, Florida. Completed plans call for site work for a municipal facility.

The Escambia County Waste Services Department located at 13009 Beulah Road, Cantonment, FL 32533 is looking for a qualified contractor to complete a landfill gas expansion project. Project includes; survey work & system layout; installation of below grade Polyvinyl chloride (PVC) and High-Density Polyethylene (HDPE) gas, air, condensation lines, and extraction wells; excavation and preservation of existing sumps; abandonment of identified existing facilities; connection of new facilities to existing facilities; abandonment of identified existing facilities; connection of new facilities to existing facilities. Contractor responsibilities consists of, furnishing all labor, materials, equipment, tools, transportation, services, incidentals, and performing all work necessary to complete the project, in place and ready for service in accordance with the Plans and Specifications prepared therefore and entitled "Perdido Landfill 2024 GCCS Expansion - Plans" & "Perdido Landfill 2024 GCCS Expansion - Technical Specifications" (These will be included as attachments) Question Submission Deadline: July 1, 2024, 1:00pm The County shall provide written notice to the Contractor no later than thirty (30) days prior to the expiration of the last one (1) year renewal period. The exercise of the option shall be for the period specified and for the prices listed on the bid form. the vendor shall pay to the County, as liquidated damages, the sum of One Thousand, Six Hundred Eighty-Five Dollars ($1685.00) for each calendar day Each offer shall be accompanied by a bid bond, cashiers check, or certified check in the amount of 5% of the total offer. The County Must require the successful Offeror(s) to furnish separate Performance and Payment bonds, under pledge of adequate surety and covering up to 100% of the dollar value of the award / an amount specified (i.e. $5,000.00) on the forms provided by the County. DESCRIPTION A. Scope of Work: The Contractor shall provide all labor, equipment, materials, and appurtenances necessary to drill, install and make ready LFG extraction wells as indicated on the Drawings. B. The perforated pipe, gravel stone, geotextile, bentonite, and soil backfill shall be set at depths and thicknesses shown on the Drawings or as designated in the field by the Engineer. It is expected that combustible and asphixiant gases will be venting from boreholes drilled in to waste within the footprint of the landfill. The Contractors bid price shall include provision for all equipment and procedures necessary to safely install wells and borings under this condition. All Work shall be performed by qualified workers in accordance with the best standards and practices available. C. Upon completion of each new extraction well or boring, Contractor shall dispose of all construction and drilling refuse materials as specified in Section 02 41 16 or as directed by the County. The work generally includes but is not limited to the following items: 1. Construction staking/system layout/surveying prior to construction. 2. Installing below grade Polyvinyl Chloride (PVC) and High-Density Polyethylene (HDPE) landfill gas (LFG) extraction wells. 3. Installing below grade high-density polyethylene (HDPE) LFG laterals and header, air supply line, and dewatering discharge line. Header appurtenances also to be installed include, but are not limited to, isolation valves, access risers, and blind flanges. 4. Excavation and preservation of sumps and associated valves. 5. Installing air supply line isolation valves, dewatering discharge isolation valves and air release valves. 6. Supplying gas wellheads, including fittings, valves, tubing, hoses, clamps, regulators and filters, and related appurtenances. 7. Abandonment in-place of limited sections of the existing GCCS. 8. Connection of the GCCS Expansion to the existing GCCS. 9. System start-up and testing. 10. Conformance surveying. 11. Providing as-built documentation (record drawings).

Award

Municipal

$367,232.00

Public - County

Site Work

8

15

4

7

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
32
Bidding Soon
456
All Active Projects
215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2024

August 7, 2024

img_map_placeholder

13009 Beulah Rd, Cantonment, FL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.