BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Bay Minette, Alabama. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Provision of Concrete Sidewalk Repair on County Right-of-Ways Bidders shall carefully read all parts of the invitation package with its accompanying schedules and attachments, if any. Bidders shall direct all requests for explanation or additional information concerning the meaning or interpretation of the conditions or attached specifications of this invitation to Wanda Gautney in writing or by e-mail (wgautney@baldwincountyal.gov) in sufficient time for a reply before submission date of bids. The Commission cannot, and does not, guarantee that such inquiries sent by mail or e-mail will be received in a timely manner or prior to the required submission date and time. It is the responsibility of the bidder to contact the Purchasing Director, Wanda Gautney at (251) 580-2520 if a reply is not received. All items below shall be in accordance with applicable portions of Section 501, Section 502, Section 618, and Section 620 of the Alabama Department of Transportation Standard Specifications for Highway Construction, 2018 Edition, and any ALDOT Special Provisions which may supersede this publication. All Bid Unit Prices shall include mobilization, labor, materials, and equipment used to complete the tasks. Concrete Sidewalk Repair/Minor Structure Concrete Repair - Concrete Sidewalk 4" Thick (Portland Cement 4000 psi) - SQYD o The quantity of accepted sidewalks or driveways will be measured, complete in place, and the area computed in square yards. o The accepted quantity of sidewalk or driveway will be paid for at the contract unit price for Concrete Sidewalks or Concrete Driveways, complete in place, which shall be payment in full for furnishing all materials (including joints), for the hauling, preparation, and placing of all materials, for removal of existing damaged concrete sidewalk, for the preparation of the subgrade, excavation, backfilling, and for all labor, equipment, tools, and incidentals necessary to complete the work. Concrete Sidewalk 6" Thick (Portland Cement 4000 psi) - SQYD o The quantity of accepted sidewalks or driveways will be measured, complete in place, and the area computed in square yards. o The accepted quantity of sidewalk or driveway will be paid for at the contract unit price for Concrete Sidewalks or Concrete Driveways, complete in place, which shall be payment in full for furnishing all materials (including joints), for the hauling, preparation, and placing of all materials, for removal of existing damaged concrete sidewalk, for the preparation of the subgrade, excavation, backfilling, and for all labor, equipment, tools, and incidentals necessary to complete the work. Concrete Sidewalk 4" Thick Reinforced with Wire Mesh (Portland Cement 4000 psi) - SQYD o The quantity of accepted sidewalks or driveways will be measured, complete in place, and the area computed in square yards. o The accepted quantity of sidewalk or driveway will be paid for at the contract unit price for Concrete Sidewalks or Concrete Driveways, complete in place, which shall be payment in full for furnishing all materials (including joints), 6 x 6 Wire Mesh, for the hauling, preparation, and placing of all materials, for removal of existing damaged concrete sidewalk, for the preparation of the subgrade, excavation, backfilling, and for all labor, equipment, tools, and incidentals necessary to complete the work. Concrete Sidewalk 6" Thick Reinforced with Wire Mesh (Portland Cement 4000 psi) - SQYD o The quantity of accepted sidewalks or driveways will be measured, complete in place, and the area computed in square yards. o The accepted quantity of sidewalk or driveway will be paid for at the contract unit price for Concrete Sidewalks or Concrete Driveways, complete in place, which shall be payment in full for furnishing all materials (including joints), 6 x6 Wire Mesh, for the hauling, preparation, and placing of all materials, for removal of existing damaged concrete sidewalk, for the preparation of the subgrade, excavation, backfilling, and for all labor, equipment, tools, and incidentals necessary to complete the work. Steel Reinforcement (USA Steel) - LBS o Where the unit of measurement for steel reinforcement is pounds {kilograms}, the weight {mass} of steel reinforcement determined as provided above shall be paid for at the contract unit price per pound {kilogram}, which price and payment shall be full compensation for fabricating, furnishing, placing, and butt welding all materials, and for all labor, equipment, tools, and incidentals necessary to complete the Item. The supplier of the reinforcing steel shall furnish to the County three copies of an itemized list of all steel included in each shipment. Such list shall show the mark of the bar, bar number, heat number, grade, length, and weight {mass} of all steel for each structure requiring reinforcing steel. (Supplier documentation is required for payment.) 9 - Minor Structure Concrete (Class A) - CUYD o The accepted Minor Structure Concrete, measured as noted above, will be paid for at the contract unit price bid which shall be full compensation for the concrete complete in place including furnishing all materials (except reinforcing steel), form work, finishing and for all equipment, tools, labor, and incidentals necessary to complete the item in accordance with plan details and these specifications. In case of modification to an existing structure, the breaking away of the concrete to the approximate lines shown on the plans and the disposal of the broken concrete and the preparation of the retained steel reinforcement for splicing as required shall be considered incidental to the work and the cost thereof absorbed in the unit price bid. - Truncated dome retrofit - SQFT o Truncated domes for retrofit shall be selected from the ALDOT List II-25, Detectable Warning Devices. This list is in the ALDOT Department's Manual, "Materials, Sources, and Devices with Special Acceptance Requirements". Only the materials on this list shall be furnished for use. o Truncated dome retrofit shall be measured per square foot {square meter}, complete in place.

Bid Results

Sidewalks / Parking Lot

$1,449.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
40
Bidding Soon
501
All Active Projects
198
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2024

August 12, 2024

img_map_placeholder

Multiple Locations, Bay Minette, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.