BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Waverly, Iowa. Completed plans call for site work for a water / sewer project; and sidewalk / parking lot.

Question Deadline 06/21/2024 The Project will include the following construction work: Removal of the tailrace wall extending downstream from the east side of the Cedar River Dam just north of Bremer Avenue. Removal limits extend from a point approximately fifteen feet south of the dam to the south end of the tailrace wall downstream of the bridge. Removals include the portion of the existing bridge pier in line with the tailrace wall. The project also includes clearing and grubbing and excavation of the accumulated sediment adjacent to the tailrace wall. Furnish all labor, materials and equipment to construct the following: Removals, As Per Plan 1 LS Mobilization 1 LS Excavation, Class 13, Channel 3,335 CY Clearing and Grubbing 0.5 ACRE Should you have any questions, please contact our Regulatory Division by letter, email me at Abigail.A.Steele@USACE.Army.mil, or telephone (309)794-5377. The work under the proposed contract shall be completed in coordination with the Iowa DOT IA 3 / Bremer Avenue over Cedar River bridge replacement project. Work shall commence within fifteen (15) days after issuance of the "Notice to Proceed" which will coincide with the removal of portions of the bridge above the east pier/tailrace wall by the Bridge Contractor and shall be completed five (5) days prior to the scheduled date of setting beams by the Bridge Contractor. The City will receive and consider bids on the project. Award of contract will be made to the lowest responsive, responsible, qualified bidder. Names of subcontractors shall be listed and submitted with the proposal. All bids must be filed with the Public Works Director on or before the time herein set. All bids shall be made on forms furnished by the City, and must be enclosed in a separate sealed envelope and plainly identified. Each bid shall be accompanied by a bid bond, certified check, cashier's check or a Certified Share Draft in a separate sealed envelope in an amount equal to ten percent (10%) of the total amount bid. Payment to the contractor will be made in semi-monthly estimates and one final payment. Semi-monthly estimates will be equivalent to ninety-five percent (95%) of the contract value of the work completed during the preceding calendar month. Estimates will be prepared on the first day of each month by the Contractor.

Award

Water / Sewer

$105,353.00

Public - City

Site Work

18

5

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
42
Bidding Soon
530
All Active Projects
197
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2024

August 1, 2024

img_map_placeholder

E Bremer Ave, Waverly, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.