BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Mont-Laurier, Quebec. Completed plans call for site work for a bridge / tunnel; for paving for a road / highway; and road / highway.

Reference number: 20001913 Deadline for receipt of complaints: 2024-07-17 Expected contract duration without options (in months): 4 The MRC of Antoine-Labelle wishes to obtain bids for the completion of road and culvert repair work on the Le P'tit Train du Nord Linear Park (PTDN) over 3.72 km in the Mont-Laurier sector. Work includes, but is not limited to, clearing shoulders, reprofiling/digging ditches, cleaning culverts, replacing culverts, removing existing paving, granular resurfacing, preparation of the surface before paving, paving and resurfacing of shoulders with topsoil with seeding. The contractor must establish its work program so that all of the work extends over a maximum period of eight (8) consecutive calendar weeks and the paving work must be completed no later than October 24, 2024. Seeding work is excluded from this deadline, but must comply with the specifications of the estimate. If necessary, the contractor can establish his work program in two phases by postponing the paving and shoulder work until spring 2025. If this is the case, this work must be carried out before the opening of the PTDN to the public (end of May) and all other work can be carried out until the end of November 2024.

Bid Results

Bridges / Tunnels

$797,036.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
14
Bidding Soon
233
All Active Projects
79
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2024

October 14, 2024

img_map_placeholder

P'tit Train du N, Mont-Laurier, QC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.