BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2025 at 7:00 PM

Updated December 3, 2025

Site work and renovation of a mixed-use development in Santa Ana, California. Completed plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

Q&A Deadline 07/08/2024 2:00 PM (PDT) Questions regarding this RFQ shall be submitted via online The City of Santa Ana seeks pre-qualified bidders for the Santa Ana Memorial Park and Aquatics Facility Renovation Project. Notice is hereby given that the City of Santa Ana (City) has determined that all bidders for Santa Ana Memorial Park & Aquatics Facility Renovation project to be undertaken by the City must be pre-qualified prior to submitting a bid on that project. It is mandatory that all Contractors (Class "B" General Contractors only) who intend to submit a bid, fully complete the pre-qualification questionnaire, provide all materials requested herein, and be approved by the City to be on the final qualified bidders list. The City reserves the right to adjust, increase, limit, suspend or rescind the pre-qualification rating based on subsequently learned information. Contractors whose rating changes sufficient to disqualify them will be notified. In accordance with the California State Labor Code, prevailing wage rates apply. Project estimate: $25,400,000 The City of Santa Ana is redeveloping Memorial Park & Aquatics Facility. Originally dedicated in May 1950, Memorial Park is a 16.3-acre city park, located in the central-south area of the City of Santa Ana. The community center and pool are both of the original 1956 installation and are a traditional "bath house" type design. Existing facilities are very old and deteriorated; deferred maintenance is now deferred capital. Facilities must be rebuilt, as routine maintenance and renovations are no longer effective. The swimming pool shell and walls of the pool equipment room have cracked. In addition to the buildings age and poor condition, the floor plan layout does not meet today's programming needs. This project shall include complete demolition and rebuilding the aquatics facility, including the existing bath house, pool & pool equipment building. Design will include a new aquatic building, two swimming pools (recreational & competition) & pool deck with seating areas. Additional improvements will include but are not limited to, exterior lighting, cameras, lighting fixtures, landscape, irrigation, site furnishings, entrance walkways, meeting rooms, and flooring.

Award

Playgrounds / Parks / Athletic Fields

$25,400,000.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

95 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
645
Active Projects
313
Bidding Soon
3,541
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2024

October 1, 2024

Project location map

2102 S Flower St, Santa Ana, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.