Published June 25, 2024 at 8:00 PM

Updated October 1, 2024

Renovation of a library in Brookline, Massachusetts. Completed plans call for the renovation of a library.

Chiller Replacements at the Public Library of Brookline. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. General Bids will only be considered from bidders holding a Certification of Eligibility from the Division of Capital Management and Maintenance in the category of "HVAC" and in a single project amount higher than the amount of the bid. SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary to provide complete heating, ventilating and air conditioning system and general contracting work, as shown on the Drawings and as specified herein. B. Furnish all labor and materials to perform demolition work as shown on the Drawings, as required for the installation of new work, and as specified hereinafter. C. Contractor shall remove and dispose of existing chiller, chilled water pump, condensing unit, refrigerant piping, chilled water pipping, accessories and appurtenances to the extents indicated. D. Contractor shall furnish and install new air-cooled chiller, chilled water pump, chiller pump, chilled water piping, accessories, equipment support and appurtenances.

Post-Bid

Library

$589,000.00

Public - City

Renovation

16

9

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Project Record Documents, Demonstration and Training, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Other Specialties, Pest Control Devices
Division 12 - Furnishings

Division 12 - Furnishings

Art
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Flexible Connectors, HVAC Air Cleaning Devices
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Common Work Results for Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Control Software

Find More Local Projects

Within 75 Miles of This Project
310
Active Projects
173
Bidding Soon
2,901
All Active Projects
1,281
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2024

September 2, 2024

img_map_placeholder

361 Washington St, Brookline, MA

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Chiller Replacements at the Public Library of Brookline - GC Bid

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.