EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 20, 2024 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Stillwater, Minnesota. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; road / highway; and water / sewer project.

The project scope may include improvements in the cities of Mahtomedi and White Bear Lake. 1) signal or roundabout at the two entrances to Century College 2) highway improvements 3) highway drainage and surface water management 4) pedestrian and bicycle facility improvements Trunk Highway (TH) 120 is owned and operated by the Minnesota Department of Transportation (MnDOT). Washington County, Ramsey County, and MnDOT have been in ongoing discussions regarding the turnback of portions of TH 120. This segment of TH 120 is planned to be turned back as part of this project, renamed to CSAH 27, and reconstructed in 2024. If a turnback agreement between Washington County, Ramsey County, and MnDOT cannot be reached, this project will not occur. Preliminary design, along with public engagement, will determine the final project scope, right-of-way acquisition required, and cost estimates, which will be included in a future capital improvement plan. If federal funds are not received through the regional solicitation process, this project and the jurisdictional transfer would be delayed. The project is include in the County 2024-2028 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$13,500,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
76
Bidding Soon
935
All Active Projects
475
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2027

img_map_placeholder

Multiple Locations, Stillwater, MN

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.