BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Spokane Vly, Washington. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; transportation facility; and transportation facility.

The general nature of the Work is as follows: The Work includes demolition, site prep, grading, asphalt concrete paving, curbs and sidewalks, electrical, communications, stormwater, pavement markings, signage, wayfinding, landscaping and all other work as noted on project plans for the expansion of Concourse C parking lot. Question Deadline 06/28/2024 at 4:30 PM PT Questions during the bid period and inquiries regarding bid results (after bid opening) should be directed to the Planning & Development Department of Spokane Airports, Monday through Friday, between 8:00 a.m. and 4:30 p.m. by contacting Colin Hayden at chayden@spokaneairports.net. A contract according to the General Conditions, Supplementary Conditions, and Addendums (if applicable) shall be signed prior to work commencing. Each bid must be accompanied by a cashier's check or surety bid bond, in an amount of not less than five percent (5%) of the total bid for all bid schedules (including sales tax). A performance bond, payment bond, and liability insurance in accordance with the contract documents will be required for the Contract. This is a prevailing wage project per applicable State Law. The Spokane Airport Board reserves the right to reject any and all bids, to waive any informality, to accept any alternate bids, and to make such award that it deems to be in the best interest of the Airport pursuant to the terms of the Instruction to Bidders and General Conditions. The contract will be awarded to the lowest responsive and responsible bidder. All bidders are cautioned to be aware of the requirement to have their bids considered responsive. Estimate Low:$1,500,000 Estimate High:$1,700,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Sidewalks / Parking Lot

$1,401,218.00

Public - City

Paving, Site Work

29

15

12

7

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
3
Bidding Soon
107
All Active Projects
33
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

September 9, 2024

img_map_placeholder

6105 E Rutter Ave, Spokane Vly, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.