BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Fountain Valley, California. Completed plans call for the renovation of a water / sewer project.

**As of November 6, 2024 Project has not been awarded yet. Anticipated award date is on November 30, 2024.** This Project will construct maintenance platforms around the SALS pumps at Plant No. 1, and make additions to the existing maintenance platforms at the Solids Storage Facility at Plant No. 1 and the Screenings Loading Building at Plant No. 2. Questions Cut Off Date: All communications concerning this IFB must be in writing. Written questions regarding details of this IFB will be accepted (i.e., must be received) by OC SAN until 5:00 P.M. (Pacific Time Zone), July 23, 2024. Written questions must be sent by email at construction@ocsan.gov to the attention of Jay Kaura, Contracts Administrator. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Question Deadline 07/23/2024 at 5:00 PM PT Written questions must be sent by email at construction@ocsan.gov to the attention of Jay Kaura, Contracts Administrator. All emails shall contain the following in the Subject line: Project No. FE22-01: Bidder Questions 1. Unistrut bracings supporting existing pump electrical conduits, and four (4) ships ladders accessing existing elevated pump pedestals at Plant 1 Steve Anderson Lift Station. 2. Diagonal bracing supporting existing platform to frame motor gearbox at Plant 1 Solids Storage Facility. 3. Crossover bridge platforms, guard rails and platforms serving inclined screw conveyors at Plant 2 Screenings Loading Building. B. This project will address operations and maintenance access issues. Work includes the following: 1. At Plant No. 1, the Steve Anderson Lift Station (SALS) add platforms and safety railing for access to existing pump motors. a. Construct approximately 100 linear feet of elevated platform with removable guard rail, removable ships ladders, stairs, and A-frame access steps. b. Provide a removable ships ladder with 42" safety railing for motor access at each A-frame. c. Relocate existing Unistrut bracing at pumps to be above and below platform walking pathway. 2. Modify/ extend existing platform at the Plant No. 1 Solids Storage Facility 3. Add access platforms and a monorail to Plant No. 2's Screenings Loading Building.

Bid Results

Water / Sewer

$494,494.00

Public - County

Renovation

27

35

6

8

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
111
Bidding Soon
2,419
All Active Projects
1,070
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2024

October 10, 2024

img_map_placeholder

Multiple Locations, Fountain Valley, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.