BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 30, 2024 at 8:00 PM

Updated August 31, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Saint George, Kansas. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

These bids will be for the furnishing of all labor and materials, and performing all the Work in accordance with the drawings and specifications for: LOUISVILLE ROAD BRIDGE REPLACEMENT B2019-036 POT52 The project will include but not limited to the following major categories of work: 417' of Grading Pestressed Concrete Beam Span Bridge (Pbmc) With Spans of 85'-86'-59' Surfacing Seeding TIME LIMIT: 180 Consecutive Calendar Days with a Calendar Completion Date of August 1, 2025 All equipment, materials and workmanship must be in accordance with the Standard Specifications for State Road and Bridge Construction of the Kansas Department of Transportation, 2015 Edition and all supplemental Specifications and Special Provisions included therein. (NOTE: The 2015 Kansas Department of Transportation Standard Specifications for State Road and Bridge Construction will not be provided as part of this contract.) Each proposal must be accompanied by a bid bond executed by corporations authorized to contract as surety in the State of Kansas and made payable to the Pottawatomie County Treasurer. The Bidder, to whom a Contract is awarded, will be required to furnish acceptable Performance and Statutory Bonds, each in the amount of the total contract price, in conformity with the requirements of the Contract Documents. The right is reserved by the Owner to reject any and all bids and to waive any irregularity therein to determine the best responsible bid most suitable to the Owner and to approve the bonds. All persons awarded and/or entering into contracts with Pottawatomie County shall be subject to and required to comply with all applicable County, State, and Federal provisions pertaining to nondiscrimination, equal employment opportunity, and affirmative action on public contracts. Bid submission details :Emailed bids shall not be considered submitted until the bidder receives a confirmation email. Bids received after said time will be returned to the bidder unopened.

Award

Bridges / Tunnels

$1,968,190.00

Public - County

Demolition, New Construction, Paving, Site Work

49

4

16

8

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
30
Bidding Soon
457
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2024

August 12, 2024

Project location map

Louisville Rd, Saint George, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.