BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Rose, Oklahoma. Completed plans call for the renovation of a residential development.

Rehab repairs include carpentry and plumbing. Work will be completed according to the work write-up. This job must be completed in 10 working days. Work should begin within one week of notification or $100.00 will be charged for liquidated damages to the contractor for each working day of extension over the contract end date. To be considered a responsive/responsible bidder, the Mandatory Bid Response sheet and the Bid Form must be fully completed. To receive preference, bidder must be TERO certified through the Cherokee Nation Tribal Employment Rights Office; proof of certification must accompany submittals. Successful bidder will be obligated to comply with Tribal rules and regulations and TERO. The Contractor shall verify all quantities, measurements or dimensions, conditions, plans, scope of work, and write up before submitting a bid. Change Orders will not be approved based on mistaken quantity count, measurements or dimensions. At the time of the opening of bids, each bidder will be presumed to have: Inspected the sites, familiarized themselves with any existing conditions and read and become thoroughly familiar to the scope of work and contract documents. (Including all addenda) Bid Acceptance: Bids will be accepted from Indian and Non-Indian bidders. HACN reserves the right to determine if a bid meets stated requirements, and to award a purchase order for the bid that is in the best interest of the HACN, including but not limited to the total cost and capability of the bidder. Bidders are responsible for any and all costs associated with the preparation and submission of bids. No bidder may withdraw their bid within 30 days after the due date. HACN reserves the right to reject any and all bids. The successful bidder is specifically advised that any person, firm, or other party to whom it is proposed to award a subcontract under this contract must be approved by the HACN, and the TERO office must be consulted prior to any subcontractor being on site to ensure all appropriate forms, paperwork and approvals are in place. The successful bidder will be required to complete the Request for Acceptance of Subcontractor at the time of the contract signing if a subcontractor is to be utilized. Unless the successful bidder is Licensed in a Trade area (ROOFING, HVAC, PLUMBING, ELECTRICAL), a Subcontractor IS REQUIRED. All sums due to any suppliers or subcontractors must be paid and Lien Waivers submitted to HACN prior to any draw being released to Contractor. AWARDED CONTRACTOR MUST SUBMIT TO THE HOUSING AUTHORITY OF THE CHEROKEE NATION ALL REQUIRED DOCUMENTATION WITHIN THREE (3) DAYS OF NOTIFICATION OF AWARD: Insurance Certificates Listing the General Contractor as the Certificate Holder o Current General Liability o Current Auto Insurance o Current Workman's Compensation Insurance or Affidavit of Exempt Status filed with the State of Oklahoma for everyone listed on the core crew list. Core Crew List Special Trade Licenses (as applicable) for Subcontractor(s) (Ex: Roofing, HVAC, Plumbing, Electrical) Request for Acceptance of Subcontractor(s) Subcontractor Agreement(s) CDIB/Tribal Membership Cards RRP Lead Based Paint Certificate - Identify as needed per LBP test RRP Renovation Firm Certificate - Identify as needed by year built Tribal and Indian Preference: Indian preference will be given only to bidders who provide proof of current certification from the Cherokee Nation Tribal Employments Office (TERO) located in Tahlequah, OK. Proof of TERO certification must be included with the bid. This bid is subject to Section 7(b) of the Indian SelfDetermination and Education Assistance Act, (25 U.S.C.405 e) which requires in part that to the greatest extent feasible, preference in the award of contracts and subcontracts shall be given to Indian Organizations and Indian Owned Economic Enterprises. Cherokee Nation TERO requirements apply, including the fee of 1/2 of 1% of contract award. The successful bidder must complete the TERO Labor Agreement and pay all applicable fees, including $25 per day per non-Indian employee working on this project (see Legislative Act 01-14). Please contact the TERO office at (918) 453-5334 with any questions. The successful bidder must have all fees and paperwork submitted to TERO for a contract/P.O. to be considered fully executed.

Award

Residential Subdivision

$13,050.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
53
Bidding Soon
773
All Active Projects
299
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2024

July 24, 2024

img_map_placeholder

7300 E 550 Rd, Rose, OK

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.