Site work, paving and renovation of a mixed-use development in Closter, New Jersey. Completed plans call for the renovation of a pre-engineered storage facility; for site work for a pre-engineered storage facility; for paving for a pre-engineered storage facility; and water / sewer project.

As of February 7, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. Disclaimer: In order to bid on this project, you MUST contact DMR Architects for the bid documents. The work to be performed under this contract includes the following: Erection of two (2) pre- engineered pole barns at the Closter DPW site. Principal items of work in the project include: Question Deadline 01/06/2025 NJ.P.E. #24GE01749100 a. Ground Improvements per Geotechnical Report b. Foundations & slab-on-grade c. Furnishing & installation of pre-fabricated structure d. Overhead Doors. The following work will be performed and coordinated by the Owner and excluded from the bid. e. Underground Utilities f. Sitework - Excavation & Paving g. Painting h. Rough Carpentry i. Electrical & Fire Alarm The work contemplated under this Contract shall be completed within 180 days from Notice to Proceed (NTP). Each bid must be made upon the prescribed forms, furnished with the Contract Drawings and Specifications, including the non-collusion affidavit and ownership statement compliance form and must be accompanied by a Consent of Surety and a big guarantee in the form of a certified check, cashier's check, or Bid Bond of ten (10%) percent of the amount bid but not to exceed $20,000.00. The successful bidder shall furnish and deliver to the Owner a performance bond and a payment bond in the amount of 100 percent each of the accepted bid amount as security for the faithful performance and payment of the Contract. Further, the successful bidder must furnish the policies or Certificates of Insurance required by the Contract. In default thereof, said checks and the amount represented thereby will be forfeited to the aforesaid Owner as liquidated damages. Bids must be accompanied, in the case of corporations not chartered in New Jersey, by proper certificate that such corporation is authorized to do business in the State of New Jersey. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27 regarding equal employment opportunity, as amended. All corporations and partnerships and limited liability companies must comply with N.J.S.A. 52:25-24.2, regarding disclosure of members, partners and stockholders. Each bid must be enclosed in a sealed envelope bearing the name and address of the bidder, addressed to the Owner and labeled for the The successful bidder will be required to comply with all provisions of prevailing wage rates as determined by the New Jersey Department of Labor. Unless otherwise permitted by N.J.S.A. 40A:11-23.3, all bids shall be irrevocable, not subject to withdrawal and shall stand available for a period of sixty (60) days in accordance with N.J.S.A. 40A:11-24. The Owner and Bidder may agree to hold bids for consideration for a longer period of time, in accordance with N.J.S.A. 40A:11-24. The Owner reserves the right to reject bids pursuant to N.J.S.A. 40A:11-a13.2, N.J.A.C. 7:22- 9.10, or other applicable law; to waive minor informalities or non- material exceptions in the bids received and to accept the bid from the lowest responsible bidder, as per N.J.S.A. 40A: 11-1, et seq.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$1,285,168.00

Public - City

Paving, Renovation, Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

21

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Metal Roof Panels, Metal Wall Panels
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Quarry Tiling, Ceilings, Flooring, Flooring Treatment, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Interior Specialties, Partitions, Exterior Specialties, Protective Covers, Canopies
Division 12 - Furnishings

Division 12 - Furnishings

Art
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Excavation Support and Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping, Public Storm Utility Drainage Piping, Culverts
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
526
Active Projects
287
Bidding Soon
5,277
All Active Projects
2,190
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 17, 2025

March 18, 2025

img_map_placeholder

130 Ruckman Rd, Closter, NJ

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Closter DPW Pole Barn Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.