Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 21, 2024 at 8:00 PM

Updated June 22, 2024

Site work and paving for a bridge / tunnel in Nenzel, Nebraska. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Location: Bryan Bridge Detailed Termini: Bryan Bridge 2 miles south of Valentine on US-20 old alignment Hwy : US-20 Begin RP : 199.81 Length : 0.0 County : Cherry As of June 20, 2024, the project is in Final Planning status. Anticipated letting Year is 2024. NEDOT - Bridge Rehabilitation - US-20

Final Planning

Bridges / Tunnels

$1,971,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
5
Bidding Soon
65
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 2, 2024

Project location map

US-20, Nenzel, NE

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed