BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Bradenton, Florida. Completed plans call for site work for a water / sewer project.

JIGGS Landing Boardwalk Repair Phase II SCOPE Successful Bidder (hereinafter in this Scope referred to as Contractor shall furnish all equipment, labor, materials, supplies, licensing, transportation, and other components necessary to provide Jiggs Landing Boardwalk Repair Services that will meet the requirements of the Agreement. 1.03 GENERAL REQUIREMENTS A. Work may take place Monday through Friday during daylight hours only. B. Trails and amenities in work areas will be closed at all times while work is taking place. C. Provide for the safety of visitors during ingress and egress to closed work areas and for those visitors who may disregard or disobey signage and enter work areas. D. Work areas shall be made free of hazards and safe for pedestrian traffic at the end of each work week (Friday) for reopening of trails over the weekend. E. If work areas cannot be reopened it must be adequately secured and marked using red "Danger" tape provided. F. Wherever possible, trails are to be reopened during Saturday and Sunday when work will not take place. G. Removal and proper disposal of all debris generated during this work will be the responsibility of the contracto o Railing Supports: Replace railing supports with PT wood 6"x 6" x 4' posts Metal grab bar on railing can be re-attached to the new railing with stainless hardware. o Remove and replace all toe kicks with composite lumber from WearDeck 2"x 4" and secure with stainless hardware. Toe kicks should be 2 boards stacked andTask 2: Boat Dock (approx. 145 x 9 ft.) o Remove and replace all deck boards with composite lumber from WearDeck 2"x 6" and secure with stainless hardware. o No toe kick. C. Task 3: Boardwalk to Kayak Launch (approx. 20 x 5 ft.) o Remove and replace all deck boards with composite lumber from WearDeck 2"x 6" and secure with stainless hardware. o No toe kick. D. Task 4: Boardwalk to Boat Ramp Dock (approx. 65 x 8 ft.) o Remove and replace all deck boards with composite lumber from WearDeck 2"x 6" and secure with stainless hardware. o No toe kick. Question Deadline 07/09/2024

Award

Water / Sewer

$67,760.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
268
Active Projects
108
Bidding Soon
2,010
All Active Projects
808
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 22, 2024

August 21, 2024

November 19, 2024

img_map_placeholder

6106 63rd St E, Bradenton, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.