BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Waterford, Wisconsin. Working plans call for site work for a sidewalk / parking lot.

As of 8/15/2024, this project is not moving forward per the Owner. It will not go out for rebid. The Village of Waterford currently has 1 cantilever pier directly used by patrons launching and removing boats from the Village owned launch. A second matching pier is proposed to be constructed to be used for transient docking and additional fishing space. Pier includes an ADA compliant 6-inch thick concrete ramp for access. Inspection of current pier may be done at any time. A matching grant has been secured with the assistance of the Waterford Waterway District. Question Deadline 07/05/2024 All questions regarding this RFP and submission of proposals are required to be submitted in writing to Mike Sponholtz, Parks & Facilities Director at msponholtz@waterfordwi.gov. Q&A Emailed to Proposers: July 8, 2024 Work to be completed, no later than October 30, 2024 Scope of Work For the purposes of this RFP it is essential for the selected company to fulfill the following requirements: 1. Notes: a. Please review provided site plan & general notes (C-1) and structural plans (S-1) for additional information and requirements not listed below. 2. Earthwork: a. Undercut areas below proposed structures to suitable soil material. b. Densify exposed granular soils encountered at base of excavations using a minimum of two passes with vibratory plate compaction equipment. c. Backfill and fill areas below proposed structures with compacted structural backfill material to the required subgrade elevation unless otherwise shown on the drawings. 3. Concrete Work: a. Provide concrete to specification b. Provide reinforcing bars to specification c. Provide additional reinforcing at openings in accordance to typical detail unless otherwise shown 4. Structural Steel Work: a. Fabricate and erect structural steel, shapes, and plates in accordance to specification b. Weld structural steel per specification c. Provide high strength bolts for structural steel connections per specification d. No field cutting of structural steel members for the work of other trades without prior approval of the engineer 5. Carpentry Work: a. Provide kiln dried southern yellow pine or Douglas fir larch, grade no. 1 or better wood framing pressure treated to minimum .40% retention and suitable for ground contact b. Provide KADT (kiln dried after treatment) decking in brown color c. Provide screw fasteners for any connection between lumber members that does not involve engineered fasteners; provide triple coated steel or stainless steel suitable for exposure to pressure treated lumber d. Provide engineered fasteners at all connections that are placed at an angle to the main member per specifications 6. Shoreline Work: a. Shoreline protection as needed b. Temporary Cofferdam for dewatering - Design by Contractor

Final Planning

Sidewalks / Parking Lot

$480,000.00

Public - City

Site Work

4

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
369
Active Projects
176
Bidding Soon
3,818
All Active Projects
1,472
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 11, 2024

October 1, 2024

October 30, 2024

img_map_placeholder

To Be Determined, Waterford, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.