BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Pasadena, California. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; and for paving for a road / highway.

The project consists of the installation of a new traffic signal at Orange Grove Boulevard at Craig Avenue . The work includes furnishing and installing traffic signal standards, traffic signal cabinet and controller. It also includes furnishing and installing traffic signal equipment, video detection cameras, conduits, conductors, pull boxes, curb extensions, curb ramps, and fiber optic cables and equipment, removal of existing street light standards, sandblasting, striping, signage, and miscellaneous appurtenant work. Question Deadline 07/22/2024 at 3:30 PM PT Questions must be submitted via Online Electronic Bid bond is required. Bidders must provide all required information for the City to verify the bond with their bid. The bond must meet the following requirements and characteristics: Bid security in the amount of five-percent (5%) of the total bid price in the form of a redeemable or callable electronic surety bond, meeting City requirements, must accompany all bids. In submitting this bid, the Bidder warrants that it has work experience comparable to that which is to be performed. Prior to award of a contract, the City may request of any Bidder, a statement setting forth their work experience of a nature comparable with that which is to be performed. Such statement shall describe the work performed over the period of three (3) years preceding the date of said statement, and shall give the owner, location, and contract price, together with the dates of beginning and completion of such work. This statement of experience shall be submitted within seven (7) calendar days after the City's notification to so submit. Failure to submit an adequate statement can result in rejection of the bid as nonresponsive. The bid range is $510K to $660k *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Results: Traffic Signal Installation : Select Electric, Inc - $329,916.00 Civil Improvements : Alfaro Communications Construction Inc. - $172,036.55

Award

Roads / Highways

$694,249.00

Public - City

Outdoor Lighting, Paving, Site Work

8

9

29

6

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
120
Bidding Soon
2,194
All Active Projects
1,013
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2024

September 23, 2024

img_map_placeholder

Orange Grove Blvd & N Craig Ave, Pasadena, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.