Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 15, 2025 at 7:00 PM
Updated December 16, 2025
Site work and paving for a mixed-use development in Puyallup, Washington. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
**As of December 15, 2025, the project was awarded to Hcon Incorporated, with an awarded amount of $2,635,965.90** This project includes the construction of new sidewalk on 7th Ave SE between 7th St SE and 21st St SE including: 1. Installation of all required temporary erosion and sedimentation control measures. 2. Construction of 1300 LF of stormwater main, a treatment unit, and other structure work. 3. Utility relocations for public utilities and utility coordination with private utilities. 4. Demolition and site restoration, including but not limited HMA paving, sidewalks, ADA ramps, soft surface restoration, and driveways. 5. Providing all associated work as shown on the Plans and within these specifications, for a complete and finalized workable system. Est. Value Notes: $3,000,000 - $3,500,000 Pre-Bid Meeting Info: No Prebid Meeting will be held for this project. Bidders are allowed to visit the site at any time. Though not mandatory, it is highly encouraged that any prospective bidders visit the site prior to submitting a bid. Site Address: 700 -2100 Block 7th Ave SE City: Puyallup County: Pierce State/Province: WA Site Directions: 7th Ave SE, 7th St SE to 21st St SE Project Owner Number: 20-002 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. : These Contract Documents describe the Work in its entirety. The Work includes widening the south side of 7 th Avenue SE, between 7 th Street SE and 21 st Street SE excluding the 512 overpass using dense HMA including curb and gutter, pervious concrete sidewalks, dense concrete driveway entrances, dense concrete curb ramps, and miscellaneousrestoration. Other work elements include installation of approximately 1300 linear feet of new 12-inch storm main, and a stormwater treatment structure and other work. For technical information, contact Kelton Parker, (253) 435-3649, KParker@puyallupwa.gov.
Award
Sidewalks / Parking Lot
$2,635,966.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 4, 2025
January 1, 2026
7th Ave SE, Puyallup, WA
Related To This Project
Puyallup, WA
--
Puyallup, WA
--
Puyallup, WA
--
Puyallup, WA
--
Puyallup, WA
--
Puyallup, WA
--
Puyallup, WA
--
Puyallup, WA
--
Puyallup, WA
--
Puyallup, WA
--
Puyallup, WA
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
