BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 24, 2025 at 8:00 PM

Updated August 19, 2025

Demolition, site work, paving and new construction of a mixed-use development in Sanger, California. Completed plans call for the construction of a pre-engineered storage facility; for site work for a pre-engineered storage facility; water / sewer project; for the demolition of a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project consists of the design and construction of a new admin buildings to replace other facilities that were lost during the Creek Fire. The project will be delivered through a single award Design-Build Contract. The Design-Build Contractor (DBC) shall provide all labor, materials, supplies, equipment, transportation, geotechnical investigation, construction administration services, ancillary services and other necessary items to complete the Work. The Work includes multi-disciplinary design based upon Forest Service-provided Project Definition Documents and existing designs that will be integrated and evolved into a complete set of construction drawings. Additional deliverables anticipated are a project manual, schedule of values, construction cost estimates, building and site design compliant with all building codes, agency space policies, security requirements, and any additional agency requirements. Upon final approval of the Complete Stamped and Signed Construction Documents, the building and site shall be constructed as designed and specified, according to all applicable laws and requirements. Question Deadline 02/18/2025 at 2:00 PM PT PROJECT LOCATION Trimmer Work Center: 34849 Maxon Road, Sanger CA, 93657 Auberry Station: lat/long 37.100026, -119.498121 C.3 MAGNITUDE OF CONSTRUCTION PROJECT In accordance with FAR 36.204, project magnitude greater than $10,000,000.00. Establishes Phase2 site visit RFI submission date as NLT 31 December 2024 / 1700 ES Amends Phase2 site visit RFI submission date to NLT 18 February 2025 / 1700 ES

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$14,222,200.00

Public - Federal

Demolition, New Construction, Paving, Site Work

6

7

4

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
1
Bidding Soon
301
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2025

December 3, 2025

Project location map

Multiple Locations, Sanger, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.